Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › GlobalFoundries U.S., Inc. › Principal Eng Process Engineering

Principal Eng Process Engineering aig GlobalFoundries U.S., Inc.: Tuarastalan H-1B

11 iarrtasan cumhaichean-obrach airson an dreuchd Principal Eng Process Engineering aig GlobalFoundries U.S., Inc.. Tuarastal bunasach meadhanach $109,335; leth meadhanach $105,736–$110,501.

Iarrtasan (LCAs)11
Tuarastal meadhanach a chaidh a thabhann$109,335
Leath mheadhanach nan tuarastalan$105,736–$110,501
Ceudail 10mh–90mh$102,120–$111,987

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20243$102,120
FY20253$108,971
FY20265$110,219

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$110,219–$146,000
Ìre II
Malta, NY30 Gibl 20261 Dàmh 2026Dearbhaichte
$112,944–$146,000
Ìre II
Malta, NY23 Gibl 202618 Cèit 2026Dearbhaichte
$110,783–$146,000Malta, NY26 Màrt 202621 Lùna 2026Dearbhaichte
$109,335–$145,800Malta, NY27 Faoi 20267 Màrt 2026Dearbhaichte
$109,335–$145,800Malta, NY18 Dùbh 202517 Màrt 2026Dearbhaichte
$109,341–$119,000Malta, NY16 Ògmh 202530 Ògmh 2025Dearbhaichte
$108,971–$145,800
Ìre III
Malta, NY27 Cèit 202530 Iuch 2025Dearbhaichte
$102,501–$142,000Malta, NY19 Dùbh 202418 Gearr 2025Dearbhaichte
$102,120–$142,000Malta, NY14 Ògmh 202426 Ògmh 2024Dearbhaichte
$102,120–$142,000Malta, NY10 Ògmh 20241 Dàmh 2024Dearbhaichte
$111,987–$133,100
Ìre III
Malta, NY6 Gearr 202418 Màrt 2024Dearbhaichte

Obraichean eile aig GlobalFoundries U.S., Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).