Dachaigh › Luchd-obrach › Goken America, LLC › Sr. Design Engineer
Sr. Design Engineer aig Goken America, LLC: Tuarastalan H-1B
19 iarrtasan cumhaichean-obrach airson an dreuchd Sr. Design Engineer aig Goken America, LLC. Tuarastal bunasach meadhanach $88,192; leth meadhanach $83,054–$97,573.
Iarrtasan (LCAs)19
Tuarastal meadhanach a chaidh a thabhann$88,192
Leath mheadhanach nan tuarastalan$83,054–$97,573
Ceudail 10mh–90mh$82,147–$97,914
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 1 | $89,378 |
| FY2024 | 3 | $87,589 |
| FY2025 | 3 | $97,198 |
| FY2026 | 10 | $85,623 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $97,573–$112,069 Ìre III | Dublin, OH | 18 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $149,344–$174,616 Ìre III | Dublin, OH | 29 Gibl 2026 | 18 Cèit 2026 | Air a tharraing air ais |
| $77,792–$93,641 Ìre I | Dublin, OH | 28 Gibl 2026 | 11 Cèit 2026 | Dearbhaichte |
| $83,054–$97,572 Ìre II | Dublin, OH | 21 Gibl 2026 | 11 Cèit 2026 | Dearbhaichte, an uair sin air a tharraing air ais |
| $97,573–$112,069 Ìre III | Dublin, OH | 31 Màrt 2026 | 20 Gibl 2026 | Dearbhaichte |
| $83,054–$97,572 Ìre II | Dublin, OH | 5 Màrt 2026 | 23 Màrt 2026 | Dearbhaichte |
| $83,054–$97,572 Ìre II | Dublin, OH | 5 Màrt 2026 | 16 Màrt 2026 | Dearbhaichte, an uair sin air a tharraing air ais |
| $83,054–$97,572 Ìre II | Dublin, OH | 3 Màrt 2026 | 23 Màrt 2026 | Dearbhaichte |
| $126,131–$150,653 Ìre II | Dublin, OH | 4 Dùbh 2025 | 29 Dùbh 2025 | Dearbhaichte |
| $97,573–$112,069 Ìre III | Dublin, OH | 16 Sult 2025 | 6 Gearr 2026 | Dearbhaichte |
| $97,573–$112,069 Ìre III | Dublin, OH | 11 Sult 2025 | 6 Gearr 2026 | Air a tharraing air ais |
| $97,573–$112,069 Ìre III | Dublin, OH | 22 Lùna 2025 | 10 Gearr 2026 | Dearbhaichte, an uair sin air a tharraing air ais |
| $97,198–$117,103 Ìre II | Dublin, OH | 12 Ògmh 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $87,589–$102,730 Ìre II | Dublin, OH | 24 Iuch 2024 | 5 Lùna 2024 | Dearbhaichte |
| $80,787–$96,761 Ìre II | Dublin, OH | 10 Cèit 2024 | 10 Ògmh 2024 | Dearbhaichte |
| $98,426–$112,569 Ìre III | Dublin, OH | 25 Gibl 2024 | 13 Cèit 2024 | Dearbhaichte, an uair sin air a tharraing air ais |
| $88,192–$103,084 Ìre III | Dublin, OH | 8 Ògmh 2023 | 1 Dàmh 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| $88,192–$103,084 Ìre III | Dublin, OH | 26 Gibl 2023 | 13 Lùna 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| $89,378–$108,533 Ìre II | Dublin, OH | 30 Faoi 2023 | 6 Gearr 2023 | Dearbhaichte |
Sr. Design Engineer aig gach neach-fastaidh →
Obraichean eile aig Goken America, LLC
- Design Engineer II$70,283
- Design Engineer III$85,883
- Design Release Engineer III$98,426
- Design Engineer I$68,557
- Design Release Engineer II$93,642
- Test Engineer II$69,420
- CAE Engineer II$88,192
- Design Project Lead$112,070
- Engineering Consultant$85,883
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).