Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Grainger Management LLC › Quality Engineer

Quality Engineer aig Grainger Management LLC: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Quality Engineer aig Grainger Management LLC. Tuarastal bunasach meadhanach $129,865; leth meadhanach $129,169–$133,580.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$129,865
Leath mheadhanach nan tuarastalan$129,169–$133,580
Ceudail 10mh–90mh$127,247–$140,432

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20241$129,169
FY20253$129,865
FY20261$133,580

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$133,580
Ìre IV
Lake Forest, IL2 Gearr 202619 Ògmh 2026Dearbhaichte
$125,966
Ìre IV
Lake Forest, IL20 Màrt 202528 Lùna 2025Dearbhaichte
$145,000
Ìre III
Chicago, IL2 Dùbh 20246 Faoi 2025Dearbhaichte
$129,169
Ìre III
Lake Forest, IL17 Samh 20231 Cèit 2024Dearbhaichte
$129,865
Ìre III
Lake Forest, IL7 Dùbh 20221 Ògmh 2023Dearbhaichte, an uair sin air a tharraing air ais

Quality Engineer aig gach neach-fastaidh →

Obraichean eile aig Grainger Management LLC

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).