Dachaigh › Luchd-obrach › Gray Construction, Inc.
Gray Construction, Inc.: Tuarastalan H-1B agus taic bhìosa
Chuir Gray Construction, Inc. 11 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 9. Tuarastal meadhanach a chaidh a thabhann: $103,500.
A bheil Gray Construction, Inc. a’ toirt taic do bhìosaichean H-1B?
Chuir Gray Construction, Inc. 11 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 20 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Assistant Project Manager | 4 | $107,452 |
| Assistant Project Manager - Mandarin | 2 | $93,000 |
| Project Engineer | 2 | $80,000 |
| Senior Project Manager | 1 | $155,000 |
| Project Manager | 1 | $132,000 |
| Senior Manager, Modularization & Integration | 1 | $110,000 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2024 | 1 | $91,000 |
| FY2025 | 8 | $103,500 |
| FY2026 | 2 | $111,405 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Assistant Project Manager | $111,405 Ìre III | Phoenix, AZ | 20 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Assistant Project Manager | $111,405 Ìre III | Phoenix, AZ | 14 Cèit 2026 | 1 Dàmh 2026 | Air a tharraing air ais |
| Project Manager | $132,000 Ìre IV | Fullerton, CA | 28 Cèit 2025 | 23 Ògmh 2025 | Dearbhaichte |
| Assistant Project Manager | $103,500 Ìre II | Lexington, KY | 23 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Project Engineer | $80,000 Ìre I | Phoenix, AZ | 23 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Assistant Project Manager | $103,500 Ìre II | Lexington, KY | 19 Cèit 2025 | 1 Dàmh 2025 | Air a tharraing air ais |
| Project Engineer | $80,000 Ìre I | Phoenix, AZ | 15 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| Assistant Project Manager - Mandarin | $95,000 Ìre II | Charlotte, NC | 23 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Senior Manager, Modularization & Integration | $110,000 Ìre I | Lexington, KY | 22 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Senior Project Manager | $155,000 Ìre IV | Charlotte, NC | 6 Gearr 2025 | 11 Iuch 2025 | Dearbhaichte |
| Assistant Project Manager - Mandarin | $91,000 Ìre II | Charlotte, NC | 13 Gearr 2024 | 13 Gearr 2024 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).