Dachaigh › Luchd-obrach › GZA GeoEnvironmental, Inc.
GZA GeoEnvironmental, Inc.: Tuarastalan H-1B agus taic bhìosa
Chuir GZA GeoEnvironmental, Inc. 15 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 15. Tuarastal meadhanach a chaidh a thabhann: $77,064.
A bheil GZA GeoEnvironmental, Inc. a’ toirt taic do bhìosaichean H-1B?
Chuir GZA GeoEnvironmental, Inc. 15 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 13 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Engineer I | 6 | $74,724 |
| Assistant Project Manager | 3 | $97,011 |
| Entry Level Geotechnical/Dam Safety Engineer | 1 | $75,003 |
| Project Manager | 1 | $88,350 |
| Environmental Engineer I | 1 | $69,181 |
| Engineer II | 1 | $77,064 |
| Planner II | 1 | $68,016 |
| Geotechnical Technical Specialist | 1 | $116,688 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 3 | $71,000 |
| FY2024 | 3 | $72,405 |
| FY2025 | 6 | $79,550 |
| FY2026 | 3 | $92,040 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Engineer I | $81,016 Ìre I | Fairfield, NJ | 13 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Geotechnical Technical Specialist | $116,688 Ìre III | Norwood, MA | 13 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Assistant Project Manager | $92,040 Ìre I | Norwood, MA | 5 Samh 2025 | 27 Gearr 2026 | Dearbhaichte |
| Assistant Project Manager | $97,011 Ìre I | Norwood, MA | 15 Sult 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Assistant Project Manager | $98,654 Ìre II | Norwood, MA | 15 Sult 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Engineer II | $77,064 Ìre I | Norwood, MA | 21 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Planner II | $68,016 Ìre I | Fairfield, NJ | 15 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Engineer I | $82,035 Ìre II | Hooksett, NH | 13 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Engineer I | $77,043 Ìre II | Bedford, NH | 5 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Engineer I | $72,405–$87,000 Ìre I | Trumbull, CT | 20 Ògmh 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Environmental Engineer I | $69,181–$83,520 Ìre I | Bedford, NH | 31 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Project Manager | $88,350–$111,600 Ìre I | Brookfield, WI | 22 Màrt 2024 | 3 Gibl 2024 | Dearbhaichte |
| Entry Level Geotechnical/Dam Safety Engineer | $75,003–$79,810 Ìre I | Fairfield, NJ | 12 Sult 2023 | 31 Dàmh 2023 | Dearbhaichte |
| Engineer I | $70,000–$86,920 Ìre I | Norwood, MA | 14 Gearr 2023 | 27 Gearr 2023 | Dearbhaichte |
| Engineer I | $71,000–$85,000 Ìre I | New York, NY | 9 Faoi 2023 | 16 Faoi 2023 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).