Dachaigh › Luchd-obrach › H-E-B, LP › Sr. Software Engineer
Sr. Software Engineer aig H-E-B, LP: Tuarastalan H-1B
7 iarrtasan cumhaichean-obrach airson an dreuchd Sr. Software Engineer aig H-E-B, LP. Tuarastal bunasach meadhanach $117,900; leth meadhanach $115,000–$128,000.
Iarrtasan (LCAs)7
Tuarastal meadhanach a chaidh a thabhann$117,900
Leath mheadhanach nan tuarastalan$115,000–$128,000
Ceudail 10mh–90mh$104,800–$131,000
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 1 | $117,900 |
| FY2024 | 1 | $133,000 |
| FY2025 | 3 | $115,000 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $98,000–$194,000 Ìre III | San Antonio, TX | 11 Ògmh 2025 | 7 Dàmh 2025 | Dearbhaichte |
| $115,000–$176,300 Ìre IV | San Antonio, TX | 20 Samh 2024 | 24 Gibl 2025 | Dearbhaichte |
| $128,000–$190,200 Ìre III | Carrollton, TX | 3 Dàmh 2024 | 9 Dàmh 2024 | Dearbhaichte |
| $133,000–$190,200 Ìre III | Austin, TX | 13 Sult 2024 | 29 Samh 2024 | Dearbhaichte |
| $133,000–$190,200 Ìre III | Austin, TX | 5 Sult 2024 | 29 Samh 2024 | Air a tharraing air ais |
| $133,000–$190,200 Ìre III | Austin, TX | 30 Lùna 2024 | 29 Samh 2024 | Air a tharraing air ais |
| $117,900–$176,700 Ìre III | Austin, TX | 1 Gearr 2023 | 24 Gibl 2023 | Dearbhaichte |
Sr. Software Engineer aig gach neach-fastaidh →
Obraichean eile aig H-E-B, LP
- Senior Software Engineer$127,733
- Staff Software Engineer$148,866
- Senior Data Engineer$128,000
- Staff Data Engineer$150,000
- Software Engineer II$109,000
- Manager, Software Engineering$172,300
- Senior Business Systems Analyst$120,088
- Staff Systems Developer$132,600
- Data Scientist II$128,100
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).