Dachaigh › Luchd-obrach › H.W. Lochner, Inc
H.W. Lochner, Inc: Tuarastalan H-1B agus taic bhìosa
Chuir H.W. Lochner, Inc 15 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 15. Tuarastal meadhanach a chaidh a thabhann: $91,333.
A bheil H.W. Lochner, Inc a’ toirt taic do bhìosaichean H-1B?
Chuir H.W. Lochner, Inc 15 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 16 Iuch 2025. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Iarrtasan cairt uaine (PERM) aig H.W. Lochner, Inc: 6 →
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Bridge Engineer | 2 | $101,951 |
| Engineer Associate II | 2 | $73,892 |
| Traffic Engineer | 2 | $104,354 |
| Engineer Entry Level | 1 | $70,720 |
| Structural Engineer | 1 | $91,333 |
| Engineer Associate | 1 | $75,348 |
| Engineer Associate I | 1 | $69,389 |
| Structural Engineer II | 1 | $104,645 |
| Engineer I | 1 | $91,499 |
| Inspector II | 1 | $90,147 |
| Structural Design Engineer | 1 | $85,000 |
| Structural Engineer, PE | 1 | $112,507 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 4 | $83,340 |
| FY2024 | 4 | $85,322 |
| FY2025 | 7 | $102,316 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
- Tampa, FL4
- Chicago, IL4
- Lexington, KY1
- Hammond, IN1
- LaPorte, IN1
- Salt Lake City, UT1
- Cranston, RI1
- Lenexa, KS1
- La Porte, IN1
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Bridge Engineer | $109,886 Ìre III | Chicago, IL | 16 Iuch 2025 | 4 Dùbh 2025 | Dearbhaichte |
| Traffic Engineer | $102,316 | Salt Lake City, UT | 15 Cèit 2025 | 4 Sult 2025 | Dearbhaichte |
| Inspector II | $90,147 Ìre I | Cranston, RI | 13 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Engineer Associate II | $68,640 Ìre I | Lenexa, KS | 6 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Structural Design Engineer | $85,000 Ìre II | La Porte, IN | 5 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Structural Engineer, PE | $112,507 Ìre III | Tampa, FL | 11 Gibl 2025 | 24 Sult 2025 | Dearbhaichte |
| Traffic Engineer | $106,392 Ìre III | Tampa, FL | 7 Gearr 2025 | 11 Iuch 2025 | Dearbhaichte |
| Structural Engineer II | $104,645 Ìre III | Chicago, IL | 30 Lùna 2024 | 15 Samh 2024 | Dearbhaichte |
| Engineer I | $91,499 Ìre II | LaPorte, IN | 14 Lùna 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Engineer Associate I | $69,389 Ìre I | Hammond, IN | 23 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Engineer Associate II | $79,144 Ìre I | Tampa, FL | 8 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Engineer Associate | $75,348 Ìre I | Lexington, KY | 11 Lùna 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Bridge Engineer | $94,016 Ìre II | Chicago, IL | 14 Iuch 2023 | 24 Iuch 2023 | Dearbhaichte |
| Structural Engineer | $91,333 Ìre II | Chicago, IL | 1 Ògmh 2023 | 24 Lùna 2023 | Dearbhaichte |
| Engineer Entry Level | $70,720 Ìre I | Tampa, FL | 3 Gearr 2023 | 13 Gearr 2023 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).