Dachaigh › Luchd-obrach › Harman Connected Services Inc › Architect
Architect aig Harman Connected Services Inc: Tuarastalan H-1B
8 iarrtasan cumhaichean-obrach airson an dreuchd Architect aig Harman Connected Services Inc. Tuarastal bunasach meadhanach $116,903; leth meadhanach $99,900–$137,500.
Iarrtasan (LCAs)8
Tuarastal meadhanach a chaidh a thabhann$116,903
Leath mheadhanach nan tuarastalan$99,900–$137,500
Ceudail 10mh–90mh$99,198–$140,950
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 4 | $99,800 |
| FY2024 | 2 | $141,403 |
| FY2025 | 1 | $137,500 |
| FY2026 | 1 | $137,500 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $137,500–$178,750 Ìre III | Bellevue, WA | 19 Dùbh 2024 | 24 Gearr 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| $137,500–$192,500 Ìre III | Bellevue, WA | 15 Samh 2024 | 1 Dùbh 2024 | Dearbhaichte |
| $149,000–$178,000 Ìre III | South San Francisco, CA | 19 Ògmh 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $133,806–$160,567 Ìre III | Westminster, CO | 20 Màrt 2024 | 1 Gibl 2024 | Dearbhaichte |
| $98,259–$130,000 Ìre III | Chicago, IL | 17 Iuch 2023 | 1 Lùna 2023 | Dearbhaichte |
| $99,600–$109,560 Ìre III | Bellevue, WA | 11 Ògmh 2023 | 1 Dàmh 2023 | Dearbhaichte |
| $100,000–$140,000 Ìre III | Bellevue, WA | 17 Faoi 2023 | 24 Faoi 2023 | Dearbhaichte |
| $100,000–$140,000 Ìre III | Bellevue, WA | 9 Faoi 2023 | 16 Faoi 2023 | Dearbhaichte |
Architect aig gach neach-fastaidh →
Obraichean eile aig Harman Connected Services Inc
- Technical Lead - Product Development$97,500
- Technical Architect$130,000
- Business Analyst$91,852
- Principal Engineer, SW$121,514
- Associate Director$135,308
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).