Dachaigh › Luchd-obrach › Harris Mountain West, LLC
Harris Mountain West, LLC: Tuarastalan H-1B agus taic bhìosa
Chuir Harris Mountain West, LLC 11 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 11. Tuarastal meadhanach a chaidh a thabhann: $75,000.
A bheil Harris Mountain West, LLC a’ toirt taic do bhìosaichean H-1B?
Chuir Harris Mountain West, LLC 11 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 1 Ògmh 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Assistant Project Manager | 4 | $63,960 |
| Project Manager I | 3 | $75,000 |
| Preconstruction Engineer | 2 | $85,764 |
| Engineer (plumbing) | 1 | $101,629 |
| Engineer (HVAC) | 1 | $74,547 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2024 | 2 | $65,920 |
| FY2025 | 8 | $75,000 |
| FY2026 | 1 | $85,000 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
- Saint Paul, MN2
- Concord, CA2
- Stanton, TN2
- Salt Lake City, UT2
- Gilbert, AZ1
- Jeffersonville, OH1
- Holly Ridge, LA1
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Preconstruction Engineer | $85,000–$90,000 Ìre II | Holly Ridge, LA | 1 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Engineer (plumbing) | $101,629 Ìre I | Concord, CA | 23 Sult 2025 | 24 Dàmh 2025 | Dearbhaichte |
| Engineer (HVAC) | $74,547–$83,000 Ìre I | Gilbert, AZ | 3 Sult 2025 | 15 Sult 2025 | Dearbhaichte |
| Project Manager I | $75,000–$83,000 Ìre I | Jeffersonville, OH | 4 Lùna 2025 | 4 Lùna 2025 | Dearbhaichte |
| Project Manager I | $75,000–$83,000 Ìre I | Stanton, TN | 2 Cèit 2025 | 1 Lùna 2025 | Dearbhaichte |
| Assistant Project Manager | $62,000–$69,000 Ìre I | Salt Lake City, UT | 16 Gibl 2025 | 20 Gibl 2025 | Dearbhaichte |
| Project Manager I | $75,000–$83,000 Ìre I | Stanton, TN | 10 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Assistant Project Manager | $62,000–$690,000 Ìre I | Salt Lake City, UT | 9 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| Preconstruction Engineer | $86,528–$89,610 Ìre I | Concord, CA | 15 Samh 2024 | 1 Dùbh 2024 | Dearbhaichte, an uair sin air a tharraing air ais |
| Assistant Project Manager | $65,920 Ìre I | Saint Paul, MN | 20 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Assistant Project Manager | $65,920 Ìre I | Saint Paul, MN | 20 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).