Dachaigh › Luchd-obrach › HDR Architecture, Inc. › Design Coordinator
Design Coordinator aig HDR Architecture, Inc.: Tuarastalan H-1B
23 iarrtasan cumhaichean-obrach airson an dreuchd Design Coordinator aig HDR Architecture, Inc.. Tuarastal bunasach meadhanach $77,272; leth meadhanach $72,114–$79,892.
Iarrtasan (LCAs)23
Tuarastal meadhanach a chaidh a thabhann$77,272
Leath mheadhanach nan tuarastalan$72,114–$79,892
Ceudail 10mh–90mh$66,027–$84,903
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 4 | $65,354 |
| FY2024 | 5 | $72,114 |
| FY2025 | 5 | $76,024 |
| FY2026 | 8 | $81,390 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $85,030 Ìre I | Phoenix, AZ | 15 Ògmh 2026 | 13 Iuch 2026 | Dearbhaichte |
| $79,768 Ìre I | San Francisco, CA | 18 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $88,213 Ìre I | Los Angeles, CA | 18 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $78,520 Ìre I | Los Angeles, CA | 18 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $73,674 Ìre I | Glen Allen, VA | 18 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $79,768 Ìre I | San Francisco, CA | 18 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $83,762 Ìre I | Chicago, IL | 11 Màrt 2026 | 20 Gibl 2026 | Dearbhaichte |
| $83,013 Ìre I | Dallas, TX | 2 Màrt 2026 | 6 Gibl 2026 | Dearbhaichte |
| — Ìre I | St. Louis Park, MN | 15 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $76,024 Ìre I | Chicago, IL | 14 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $68,910 Ìre I | Atlanta, GA | 13 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $79,934 Ìre I | Arlington, VA | 10 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $72,467 Ìre I | Glen Allen, VA | 10 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $85,030 Ìre I | Phoenix, AZ | 12 Lùna 2024 | 9 Sult 2024 | Dearbhaichte |
| $72,114 Ìre I | San Diego, CA | 2 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $70,013 Ìre I | Chicago, IL | 23 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $72,114 Ìre I | San Diego, CA | 23 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $75,005 Ìre II | Seattle, WA | 23 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $78,998 Ìre I | St. Louis Park, MN | 28 Lùna 2023 | 8 Gearr 2024 | Dearbhaichte, an uair sin air a tharraing air ais |
| $65,000 Ìre I | Chicago, IL | 22 Lùna 2023 | 1 Faoi 2024 | Dearbhaichte |
| $78,998 Ìre I | Minneapolis, MN | 19 Lùna 2023 | 8 Gearr 2024 | Dearbhaichte |
| $65,000 Ìre I | Chicago, IL | 15 Lùna 2023 | 1 Faoi 2024 | Dearbhaichte |
| $65,707 Ìre I | Omaha, NE | 6 Gibl 2023 | 1 Dàmh 2023 | Dearbhaichte |
Design Coordinator aig gach neach-fastaidh →
Obraichean eile aig HDR Architecture, Inc.
- Senior Design Coordinator$107,047
- Project Architect$122,626
- Design Coordinator 2$89,045
- Design Coordinator 1$70,720
- Architect$111,114
- Interior Design Coordinator$72,363
- Health Planner 2$121,867
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).