Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Headway Technologies, Inc. › CMP Process Development Engineer

CMP Process Development Engineer aig Headway Technologies, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd CMP Process Development Engineer aig Headway Technologies, Inc.. Tuarastal bunasach meadhanach $132,253; leth meadhanach $115,003–$149,510.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$132,253
Leath mheadhanach nan tuarastalan$115,003–$149,510
Ceudail 10mh–90mh$115,003–$156,408

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20241$115,003
FY20253$149,510
FY20261$132,253

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$132,253
Ìre I
Milpitas, CA16 Màrt 20264 Sult 2026Dearbhaichte
$161,006
Ìre II
Milpitas, CA6 Màrt 20255 Sult 2025Dearbhaichte
$149,510
Ìre II
Milpitas, CA5 Màrt 20253 Sult 2025Dearbhaichte
$115,003–$140,000
Ìre II
Milpitas, CA14 Màrt 202412 Sult 2024Dearbhaichte
$115,003–$140,000
Ìre II
Milpitas, CA13 Màrt 20238 Sult 2023Dearbhaichte, an uair sin air a tharraing air ais

Obraichean eile aig Headway Technologies, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).