Dachaigh › Luchd-obrach › Henry Company LLC
Henry Company LLC: Tuarastalan H-1B agus taic bhìosa
Chuir Henry Company LLC 13 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 12. Tuarastal meadhanach a chaidh a thabhann: $149,673.
A bheil Henry Company LLC a’ toirt taic do bhìosaichean H-1B?
Chuir Henry Company LLC 13 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 23 Gibl 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| CWRT Improvement Engineer | 2 | $128,200 |
| Project Engineer | 2 | $114,960 |
| Manufacturing Engineering Manager | 2 | $149,673 |
| Project Engineering | 1 | $149,673 |
| Building Innovation Scientist | 1 | $95,534 |
| Innovation Analyst | 1 | — |
| Engineering Manager-Advanced Manufacturing | 1 | $175,898 |
| Senior Scientist - Coatings | 1 | — |
| Product Line Manager | 1 | $122,117 |
| Project Manager-Industrial Engineer | 1 | $158,401 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 5 | $149,673 |
| FY2024 | 2 | $95,534 |
| FY2025 | 2 | $175,898 |
| FY2026 | 4 | $140,259 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
- Industrial Engineers8
- Civil Engineers2
- Materials Scientists1
- Industrial Production Managers1
- Mechanical Engineers1
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Project Manager-Industrial Engineer | $158,401 Ìre IV | Garland, TX | 23 Gibl 2026 | 10 Dàmh 2026 | Dearbhaichte |
| CWRT Improvement Engineer | $158,401 Ìre IV | Garland, TX | 20 Gibl 2026 | 10 Dàmh 2026 | Dearbhaichte |
| Project Engineer | $80,246–$110,516 Ìre II | Kingman, AZ | 13 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Product Line Manager | $122,117–$134,000 Ìre III | Fernley, NV | 4 Gearr 2026 | 19 Ògmh 2026 | Dearbhaichte |
| Engineering Manager-Advanced Manufacturing | $175,898 Ìre IV | Phoenixville, PA | 9 Ògmh 2025 | 7 Dùbh 2025 | Dearbhaichte |
| Senior Scientist - Coatings | — Ìre IV | Carlisle, PA | 9 Ògmh 2025 | 30 Ògmh 2025 | Dearbhaichte |
| Building Innovation Scientist | $95,534–$120,000 Ìre III | Phoenixville, PA | 17 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Innovation Analyst | $95,534–$120,000 Ìre III | Phoenixville, PA | 15 Cèit 2024 | 1 Dàmh 2024 | Air a tharraing air ais |
| CWRT Improvement Engineer | $98,000 Ìre II | Fernley, NV | 6 Ògmh 2023 | 19 Ògmh 2023 | Dearbhaichte |
| Project Engineer | $149,673 Ìre IV | Garland, TX | 18 Gibl 2023 | 11 Dàmh 2023 | Dearbhaichte |
| Project Engineering | $149,673 Ìre IV | Garland, TX | 17 Gibl 2023 | 11 Dàmh 2023 | Dearbhaichte |
| Manufacturing Engineering Manager | $149,673 Ìre IV | Garland, TX | 12 Gibl 2023 | 11 Dàmh 2023 | Dearbhaichte |
| Manufacturing Engineering Manager | $149,673 Ìre IV | Garland, TX | 5 Gibl 2023 | 4 Dàmh 2023 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).