Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Hinduja Tech Inc. › Design Release Engineer

Design Release Engineer aig Hinduja Tech Inc.: Tuarastalan H-1B

13 iarrtasan cumhaichean-obrach airson an dreuchd Design Release Engineer aig Hinduja Tech Inc.. Tuarastal bunasach meadhanach $84,302; leth meadhanach $76,752–$87,589.

Iarrtasan (LCAs)13
Tuarastal meadhanach a chaidh a thabhann$84,302
Leath mheadhanach nan tuarastalan$76,752–$87,589
Ceudail 10mh–90mh$76,602–$90,035

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20247$84,302
FY20253$87,589
FY20263$76,752

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$93,642–$109,000
Ìre II
Auburn Hills, MI7 Dùbh 20255 Faoi 2026Dearbhaichte
$76,752–$91,000
Ìre II
Auburn Hills, MI2 Dùbh 20255 Faoi 2026Dearbhaichte
$76,752–$91,700
Ìre II
Auburn Hills, MI20 Samh 20251 Dùbh 2025Dearbhaichte
$87,589–$100,000
Ìre II
Auburn Hills, MI10 Ògmh 202516 Ògmh 2025Dearbhaichte
$78,894–$93,000
Ìre III
Auburn Hills, MI10 Ògmh 202516 Ògmh 2025Dearbhaichte
$88,754–$95,000
Ìre II
Auburn Hills, MI27 Cèit 20251 Dàmh 2025Dearbhaichte
$85,134–$95,000
Ìre II
Auburn Hills, MI7 Lùna 202412 Lùna 2024Dearbhaichte
$90,355–$104,310
Ìre II
Auburn Hills, MI15 Faoi 202429 Faoi 2024Dearbhaichte
$84,302–$98,400
Ìre II
Auburn Hills, MI19 Dùbh 20231 Faoi 2024Dearbhaichte
$76,565–$91,500
Ìre II
Auburn Hills, MI15 Dùbh 20231 Faoi 2024Dearbhaichte
$84,302–$98,400
Ìre II
Aubrun Hills, MI14 Dùbh 20231 Faoi 2024Dearbhaichte
$76,565–$91,769
Ìre II
Auburn Hills, MI10 Dùbh 20231 Faoi 2024Dearbhaichte
$84,302–$98,425
Ìre II
Auburn Hills, MI10 Dùbh 20231 Faoi 2024Dearbhaichte

Design Release Engineer aig gach neach-fastaidh →

Obraichean eile aig Hinduja Tech Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).