Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Hitachi Rail STS USA, Inc. › Signaling Functional Design Engineer

Signaling Functional Design Engineer aig Hitachi Rail STS USA, Inc.: Tuarastalan H-1B

7 iarrtasan cumhaichean-obrach airson an dreuchd Signaling Functional Design Engineer aig Hitachi Rail STS USA, Inc.. Tuarastal bunasach meadhanach $100,000; leth meadhanach $94,063–$125,000.

Iarrtasan (LCAs)7
Tuarastal meadhanach a chaidh a thabhann$100,000
Leath mheadhanach nan tuarastalan$94,063–$125,000
Ceudail 10mh–90mh$92,438–$129,222

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$90,000
FY20251$100,000
FY20265$124,000

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$124,000
Ìre I
Oakland, CA10 Gearr 202623 Gearr 2026Dearbhaichte
$126,000
Ìre I
Pittsburgh, PA30 Faoi 20261 Màrt 2026Dearbhaichte
$134,056
Ìre II
Pittsburgh, PA29 Faoi 20261 Màrt 2026Dearbhaichte
$94,063
Ìre II
Pittsburgh, PA18 Dùbh 202529 Dùbh 2025Dearbhaichte
$94,063
Ìre I
Pittsburgh, PA21 Samh 20251 Dùbh 2025Dearbhaichte
$100,000
Ìre II
Batesburg-Leesville, SC30 Faoi 202510 Gearr 2025Dearbhaichte
$90,000
Ìre II
Pearl City, HI15 Dùbh 20222 Faoi 2023Dearbhaichte

Obraichean eile aig Hitachi Rail STS USA, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).