Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › HM Health Solutions, Inc. › Senior Client Project Manager

Senior Client Project Manager aig HM Health Solutions, Inc.: Tuarastalan H-1B

7 iarrtasan cumhaichean-obrach airson an dreuchd Senior Client Project Manager aig HM Health Solutions, Inc.. Tuarastal bunasach meadhanach $128,638; leth meadhanach $125,291–$128,638.

Iarrtasan (LCAs)7
Tuarastal meadhanach a chaidh a thabhann$128,638
Leath mheadhanach nan tuarastalan$125,291–$128,638
Ceudail 10mh–90mh$120,448–$131,630

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20234$128,638
FY20242$125,672

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$134,622
Ìre III
Englewood, CO14 Màrt 202411 Cèit 2024Dearbhaichte
$116,722
Ìre IV
Round Rock, TX27 Sult 202315 Faoi 2024Dearbhaichte
$116,722
Ìre IV
Round Rock, TX26 Sult 202315 Faoi 2024Air a tharraing air ais
$128,638
Ìre IV
Dallas, TX2 Lùna 202328 Lùna 2023Dearbhaichte
$128,638
Ìre IV
Dallas, TX26 Iuch 202328 Lùna 2023Dearbhaichte
$128,638
Ìre IV
Cedar Park, TX16 Ògmh 202316 Samh 2023Dearbhaichte
$124,175
Ìre IV
Austin, TX22 Màrt 202310 Gibl 2023Dearbhaichte

Obraichean eile aig HM Health Solutions, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).