Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › HNTB Corporation › Project Engineer

Project Engineer aig HNTB Corporation: Tuarastalan H-1B

27 iarrtasan cumhaichean-obrach airson an dreuchd Project Engineer aig HNTB Corporation. Tuarastal bunasach meadhanach $127,795; leth meadhanach $119,392–$138,611.

Iarrtasan (LCAs)27
Tuarastal meadhanach a chaidh a thabhann$127,795
Leath mheadhanach nan tuarastalan$119,392–$138,611
Ceudail 10mh–90mh$110,240–$143,604

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20237$133,985
FY20246$125,133
FY20255$136,614
FY20268$125,548

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$119,642
Ìre IV
Nashville, TN18 Ògmh 202629 Ògmh 2026Dearbhaichte
$128,128
Ìre IV
Detroit, MI4 Ògmh 20261 Dàmh 2026Dearbhaichte
$123,635
Ìre IV
Bartow, FL4 Ògmh 20261 Dàmh 2026Dearbhaichte
$122,304
Ìre IV
King of Prussia, PA29 Cèit 20261 Dàmh 2026Dearbhaichte
$110,323Virginia Beach, VA6 Gibl 202620 Gibl 2026Dearbhaichte
$127,462Tampa, FL9 Faoi 202623 Faoi 2026Dearbhaichte
$132,787Santa Ana, CA31 Dùbh 20256 Gearr 2026Dearbhaichte
$132,787Santa Ana, CA11 Dùbh 20253 Gibl 2026Dearbhaichte
$147,430
Ìre IV
Parsippany, NJ2 Ògmh 20251 Dàmh 2025Dearbhaichte
$105,165Tampa, FL2 Ògmh 202530 Ògmh 2025Dearbhaichte
$136,614
Ìre IV
Bellevue, WA19 Cèit 202526 Cèit 2025Dearbhaichte
$128,294
Ìre IV
Atlanta, GA17 Gearr 202515 Lùna 2025Dearbhaichte
$152,755
Ìre IV
Parsippany, NJ15 Dàmh 20248 Gibl 2025Dearbhaichte
$145,101
Ìre IV
Santa Ana, CA21 Lùna 20249 Sult 2024Dearbhaichte
$139,277Chelmsford, MA30 Iuch 20243 Faoi 2025Dearbhaichte
$113,651Lake Mary, FL17 Iuch 202426 Dùbh 2024Dearbhaichte
$125,133
Ìre IV
Rocky Hill, CT17 Iuch 202412 Lùna 2024Dearbhaichte
$125,133
Ìre IV
Rocky Hill, CT20 Ògmh 202412 Lùna 2024Dearbhaichte
$110,157
Ìre IV
Atlanta, GA14 Gearr 20244 Màrt 2024Dearbhaichte
$119,309
Ìre IV
Detroit, MI31 Lùna 20231 Dàmh 2023Dearbhaichte
$133,985Chelmsford, MA24 Iuch 202325 Lùna 2023Dearbhaichte
$142,106Oakland, CA12 Iuch 202321 Iuch 2023Dearbhaichte
$142,106Oakland, CA12 Iuch 202321 Iuch 2023Air a tharraing air ais
$142,106Oakland, CA5 Ògmh 202321 Ògmh 2023Dearbhaichte
$142,106Oakland, CA15 Cèit 202321 Ògmh 2023Dearbhaichte
$119,309
Ìre IV
Bellevue, WA18 Gibl 20231 Dàmh 2023Dearbhaichte
$98,675Indianapolis, IN26 Dàmh 202215 Gibl 2023Dearbhaichte

Project Engineer aig gach neach-fastaidh →

Obraichean eile aig HNTB Corporation

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).