Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Honda Development & Manufacturing of America, LLC › CAE Sr. Engineer

CAE Sr. Engineer aig Honda Development & Manufacturing of America, LLC: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd CAE Sr. Engineer aig Honda Development & Manufacturing of America, LLC. Tuarastal bunasach meadhanach $99,014; leth meadhanach $95,757–$107,500.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$99,014
Leath mheadhanach nan tuarastalan$95,757–$107,500
Ceudail 10mh–90mh$92,500–$111,035

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20241$110,000
FY20252$96,514
FY20263$100,000

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$112,070–$132,070
Ìre IV
Raymond, OH24 Gibl 202615 Ògmh 2026Dearbhaichte
$90,000–$110,000
Ìre II
Raymond, OH25 Màrt 202623 Sult 2026Dearbhaichte
$100,000–$120,000Raymond, OH18 Gearr 202614 Lùna 2026Dearbhaichte
$98,028–$118,028
Ìre II
Marysville, OH12 Cèit 20251 Dàmh 2025Dearbhaichte
$95,000–$115,000Raymond, OH27 Faoi 202518 Iuch 2025Dearbhaichte
$110,000–$125,000Raymond, OH30 Cèit 20248 Samh 2024Dearbhaichte

Obraichean eile aig Honda Development & Manufacturing of America, LLC

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).