Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › HRB Professional Resources, LLC › Lead Infrastructure Engineer

Lead Infrastructure Engineer aig HRB Professional Resources, LLC: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Lead Infrastructure Engineer aig HRB Professional Resources, LLC. Tuarastal bunasach meadhanach $142,310; leth meadhanach $135,000–$144,181.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$142,310
Leath mheadhanach nan tuarastalan$135,000–$144,181
Ceudail 10mh–90mh$134,130–$155,173

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$137,930
FY20253$144,181

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$144,181
Ìre IV
Kansas City, MO12 Dùbh 202425 Gibl 2025Dearbhaichte
$135,000
Ìre IV
Kansas City, MO12 Samh 20248 Gibl 2025Dearbhaichte
$162,501
Ìre IV
Kansas City, MO5 Samh 20245 Cèit 2025Dearbhaichte
$142,310
Ìre IV
Kansas City, MO1 Lùna 202310 Faoi 2024Dearbhaichte
$133,550
Ìre IV
Kansas City, MO6 Màrt 202313 Lùna 2023Dearbhaichte

Lead Infrastructure Engineer aig gach neach-fastaidh →

Obraichean eile aig HRB Professional Resources, LLC

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).