Dachaigh › Luchd-obrach › Hudson Construction Group
Hudson Construction Group: Tuarastalan H-1B agus taic bhìosa
Chuir Hudson Construction Group 7 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 2. Tuarastal meadhanach a chaidh a thabhann: $67,250.
A bheil Hudson Construction Group a’ toirt taic do bhìosaichean H-1B?
Chuir Hudson Construction Group 7 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 11 Gearr 2025. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Estimator | 4 | $52,000 |
| Construction Project Manager | 3 | $82,500 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2025 | 7 | $67,250 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Estimator | $52,000–$56,160 Ìre I | Winter Haven, FL | 11 Gearr 2025 | 5 Màrt 2025 | Dearbhaichte |
| Estimator | $45,760–$56,160 | Winter Haven, FL | 10 Gearr 2025 | 5 Màrt 2025 | Diùltadh |
| Estimator | $45,760–$56,160 | Winter Haven, FL | 7 Gearr 2025 | 5 Màrt 2025 | Diùltadh |
| Construction Project Manager | $82,500–$85,000 | Winter Haven, FL | 6 Gearr 2025 | 10 Màrt 2025 | Dearbhaichte |
| Estimator | $45,760–$56,160 | Winter Haven, FL | 5 Gearr 2025 | 5 Màrt 2025 | Diùltadh |
| Construction Project Manager | $82,098–$138,528 | Winter Haven, FL | 5 Gearr 2025 | 10 Màrt 2025 | Diùltadh |
| Construction Project Manager | $82,098–$138,528 | Winter Haven, FL | 3 Gearr 2025 | 4 Gearr 2025 | Diùltadh |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).