Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Hughes Network Systems LLC › Engineer III - Systems

Engineer III - Systems aig Hughes Network Systems LLC: Tuarastalan H-1B

10 iarrtasan cumhaichean-obrach airson an dreuchd Engineer III - Systems aig Hughes Network Systems LLC. Tuarastal bunasach meadhanach $103,500; leth meadhanach $102,559–$103,819.

Iarrtasan (LCAs)10
Tuarastal meadhanach a chaidh a thabhann$103,500
Leath mheadhanach nan tuarastalan$102,559–$103,819
Ceudail 10mh–90mh$102,001–$108,540

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20236$103,250
FY20253$103,819

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$102,559–$119,254
Ìre I
Germantown, MD22 Gibl 20251 Dàmh 2025Dearbhaichte
$103,819
Ìre I
Germantown, MD17 Gibl 20251 Dàmh 2025Dearbhaichte
$122,699
Ìre II
Germantown, MD5 Gearr 20258 Iuch 2025Dearbhaichte
$122,699
Ìre II
Germantown, MD5 Gearr 20258 Iuch 2025Air a tharraing air ais
$103,635
Ìre II
Germantown, MD9 Cèit 20231 Dàmh 2023Dearbhaichte
$103,500
Ìre II
Germantown, MD9 Cèit 20231 Dàmh 2023Dearbhaichte
$103,000
Ìre II
Germantown, MD9 Cèit 20231 Dàmh 2023Dearbhaichte
$105,000
Ìre II
Germantown, MD14 Gibl 20231 Dàmh 2023Dearbhaichte
$102,001
Ìre II
Germantown, MD15 Gibl 20221 Dàmh 2022Dearbhaichte, an uair sin air a tharraing air ais
$102,001
Ìre II
Germantown, MD15 Gibl 20221 Dàmh 2022Dearbhaichte, an uair sin air a tharraing air ais

Obraichean eile aig Hughes Network Systems LLC

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).