Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › The Huntington National Bank › Infrastructure Manager

Infrastructure Manager aig The Huntington National Bank: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Infrastructure Manager aig The Huntington National Bank. Tuarastal bunasach meadhanach $130,000; leth meadhanach $128,000–$135,000.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$130,000
Leath mheadhanach nan tuarastalan$128,000–$135,000
Ceudail 10mh–90mh$123,200–$140,915

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20233$130,000
FY20262$136,430

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$144,859–$160,000Columbus, OH22 Ògmh 202617 Dàmh 2026Dearbhaichte
$128,000–$145,000Dallas, TX16 Faoi 20262 Màrt 2026Dearbhaichte
$130,000–$145,000
Ìre IV
Columbus, OH27 Iuch 20234 Dùbh 2023Dearbhaichte
$120,000–$135,000Columbus, OH6 Ògmh 202317 Dàmh 2023Dearbhaichte
$135,000–$150,000
Ìre IV
Columbus, OH6 Gibl 20237 Lùna 2023Dearbhaichte

Obraichean eile aig The Huntington National Bank

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).