Dachaigh › Luchd-obrach › Hutchison Engineering, Inc.
Hutchison Engineering, Inc.: Tuarastalan H-1B agus taic bhìosa
Chuir Hutchison Engineering, Inc. 17 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 15. Tuarastal meadhanach a chaidh a thabhann: $76,149.
A bheil Hutchison Engineering, Inc. a’ toirt taic do bhìosaichean H-1B?
Chuir Hutchison Engineering, Inc. 17 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 7 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Iarrtasan cairt uaine (PERM) aig Hutchison Engineering, Inc.: 3 →
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Design Engineer | 11 | $80,910 |
| Civil Engineer | 6 | $76,149 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 5 | $76,149 |
| FY2024 | 2 | $73,518 |
| FY2025 | 3 | $72,036 |
| FY2026 | 7 | $83,408 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Design Engineer | $83,408 Ìre I | Jacksonville, IL | 7 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Design Engineer | $83,408 Ìre II | Jacksonville, IL | 7 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Design Engineer | $80,910 Ìre I | Jacksonville, IL | 7 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Design Engineer | $89,784 Ìre II | Carbondale, IL | 7 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Design Engineer | $89,784 Ìre I | Carbondale, IL | 7 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Design Engineer | $89,784 Ìre I | Carbondale, IL | 7 Cèit 2026 | 1 Dàmh 2026 | Air a tharraing air ais |
| Design Engineer | $89,784 Ìre II | Carbondale, IL | 7 Cèit 2026 | 1 Dàmh 2026 | Air a tharraing air ais |
| Design Engineer | $72,036 Ìre I | Carbondale, IL | 16 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Design Engineer | $72,036 Ìre II | Hannibal, MO | 16 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Civil Engineer | $100,224 Ìre II | Hannibal, MO | 19 Lùna 2024 | 1 Dàmh 2024 | Dearbhaichte, an uair sin air a tharraing air ais |
| Design Engineer | $74,536 Ìre I | Peoria, IL | 13 Ògmh 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Design Engineer | $72,500 Ìre I | Jacksonville, IL | 11 Ògmh 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Civil Engineer | $68,382 Ìre I | Jacksonville, IL | 5 Ògmh 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Civil Engineer | $76,149 Ìre II | Jacksonville, IL | 27 Gibl 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Civil Engineer | $76,624 Ìre II | Carbondale, IL | 27 Gibl 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Civil Engineer | $74,124 Ìre II | Carbondale, IL | 19 Gibl 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Civil Engineer | $76,149 Ìre II | Jacksonville, IL | 19 Gibl 2023 | 1 Dàmh 2023 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).