Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › iLink Systems, Inc. › Technical Project Manager

Technical Project Manager aig iLink Systems, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Technical Project Manager aig iLink Systems, Inc.. Tuarastal bunasach meadhanach $130,707; leth meadhanach $117,915–$151,424.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$130,707
Leath mheadhanach nan tuarastalan$117,915–$151,424
Ceudail 10mh–90mh$92,494–$155,056

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$137,696
FY20242$113,485
FY20261$130,707

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$130,707–$145,000
Ìre III
Peachtree City, GA10 Samh 20253 Gibl 2026Dearbhaichte
$151,424–$158,700
Ìre IV
Stamford, CT31 Cèit 202420 Dàmh 2024Dearbhaichte
$75,546–$101,800
Ìre II
Westborough, MA7 Cèit 202417 Cèit 2024Dearbhaichte
$157,477–$170,800
Ìre IV
Paramus, NJ6 Faoi 20232 Iuch 2023Dearbhaichte
$117,915–$124,600
Ìre III
Peachtree City, GA20 Dùbh 20223 Gibl 2023Dearbhaichte

Technical Project Manager aig gach neach-fastaidh →

Obraichean eile aig iLink Systems, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).