Dachaigh › Luchd-obrach › Imr Soft LLC › Java Full Stack Developer
Java Full Stack Developer aig Imr Soft LLC: Tuarastalan H-1B
8 iarrtasan cumhaichean-obrach airson an dreuchd Java Full Stack Developer aig Imr Soft LLC. Tuarastal bunasach meadhanach $106,500; leth meadhanach $95,150–$107,300.
Iarrtasan (LCAs)8
Tuarastal meadhanach a chaidh a thabhann$106,500
Leath mheadhanach nan tuarastalan$95,150–$107,300
Ceudail 10mh–90mh$81,620–$108,530
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 4 | $103,600 |
| FY2025 | 4 | $106,500 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $77,000 Ìre II | Norfolk, VA | 19 Ògmh 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $107,000 Ìre II | Iselin, NJ | 18 Ògmh 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $107,000 Ìre II | Edison, NJ | 10 Ògmh 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $106,000 Ìre II | Denton, TX | 28 Gibl 2025 | 19 Cèit 2025 | Dearbhaichte |
| $99,000 Ìre II | Irving, TX | 26 Ògmh 2023 | 3 Iuch 2023 | Dearbhaichte |
| $108,200 Ìre II | Boston, MA | 8 Ògmh 2023 | 12 Ògmh 2023 | Dearbhaichte |
| $83,600 Ìre II | Concord, NH | 18 Cèit 2023 | 1 Dàmh 2023 | Dearbhaichte |
| $109,300 Ìre II | Pearl River, NY | 28 Gibl 2023 | 8 Cèit 2023 | Dearbhaichte |
Java Full Stack Developer aig gach neach-fastaidh →
Obraichean eile aig Imr Soft LLC
- Software Developer$106,000
- Java Developer$107,500
- Software Engineer$106,000
- Data Engineer$99,000
- Sr. Performance Engineer$99,500
- DevOps Engineer$106,500
- Salesforce Developer$108,012
- Technical Architect$142,750
- Security Engineer$151,882
- Site Reliability Engineer$96,500
- Hadoop Administrator$86,500
- GenAI Engineer$106,000
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).