Dachaigh › Luchd-obrach › Informatica LLC › Director, Development
Director, Development aig Informatica LLC: Tuarastalan H-1B
5 iarrtasan cumhaichean-obrach airson an dreuchd Director, Development aig Informatica LLC. Tuarastal bunasach meadhanach $274,456; leth meadhanach $262,124–$274,456.
Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$274,456
Leath mheadhanach nan tuarastalan$262,124–$274,456
Ceudail 10mh–90mh$254,110–$274,456
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 2 | $255,446 |
| FY2025 | 3 | $274,456 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $274,456–$300,000 Ìre IV | Redwood City, CA | 15 Sult 2025 | 15 Gearr 2026 | Dearbhaichte |
| $274,456–$300,000 Ìre IV | Redwood City, CA | 25 Lùna 2025 | 21 Gearr 2026 | Dearbhaichte |
| $274,456–$281,957 Ìre IV | Redwood City, CA | 12 Lùna 2025 | 15 Dàmh 2025 | Dearbhaichte |
| $248,768–$267,368 Ìre IV | Redwood City, CA | 13 Gibl 2023 | 21 Gibl 2023 | Dearbhaichte |
| $262,124 | Redwood City, CA | 31 Dàmh 2022 | 24 Màrt 2023 | Dearbhaichte |
Director, Development aig gach neach-fastaidh →
Obraichean eile aig Informatica LLC
- Senior Software Engineer$146,401
- Principal Software Engineer$165,870
- Lead Technical Support Engineer$101,088
- Senior Technical Support Engineer$96,751
- Principal Technical Support Engineer$134,368
- Development Architect$199,958
- Senior QA Engineer$119,850
- Software Engineer$132,870
- Senior DevOps Engineer$140,446
- Technical Support Engineer$81,994
- Lead Product Specialist$125,206
- Senior Product Specialist$155,709
- Principal DevOps Engineer$164,871
- Lead IT Business Systems Analyst$89,128
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).