Dachaigh › Luchd-obrach › Insight Global, LLC › Technical Project Lead
Technical Project Lead aig Insight Global, LLC: Tuarastalan H-1B
5 iarrtasan cumhaichean-obrach airson an dreuchd Technical Project Lead aig Insight Global, LLC. Tuarastal bunasach meadhanach $112,923; leth meadhanach $103,334–$112,923.
Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$112,923
Leath mheadhanach nan tuarastalan$103,334–$112,923
Ceudail 10mh–90mh$102,698–$118,439
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2026 | 5 | $112,923 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $112,923–$130,000 Ìre II | Irving, TX | 3 Màrt 2026 | 16 Màrt 2026 | Dearbhaichte |
| $103,334–$120,000 Ìre II | Lebanon, TN | 23 Gearr 2026 | 2 Màrt 2026 | Dearbhaichte |
| $112,923–$120,000 Ìre II | Dallas, TX | 19 Gearr 2026 | 2 Màrt 2026 | Dearbhaichte |
| $122,117–$130,000 Ìre III | Lebanon, TN | 19 Gearr 2026 | 2 Màrt 2026 | Dearbhaichte |
| $102,274–$130,000 Ìre III | Centerton, AR | 19 Gearr 2026 | 2 Màrt 2026 | Dearbhaichte |
Technical Project Lead aig gach neach-fastaidh →
Obraichean eile aig Insight Global, LLC
- Data Engineer—
- Software Engineer$109,283
- RN-System Resource$105,414
- Java Developer—
- Data Analyst$73,195
- Senior Software Engineer$124,977
- RN Float Pool II$85,821
- Python Developer—
- .Net Developer—
- Software Developer—
- Hadoop Developer—
- RN-Resource Team$82,566
- Project Lead, Delivery$112,923
- Business Analyst—
- Full Stack Developer—
- Senior Data Engineer$112,736
- Data Scientist$80,850
- Product Manager—
- ETL Developer—
- Site Reliability Engineer—
- Full Stack Java Developer—
- Android Developer—
- DevOps Engineer—
- AI Engineer—
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).