Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Insight Global, LLC › Technical Project Lead

Technical Project Lead aig Insight Global, LLC: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Technical Project Lead aig Insight Global, LLC. Tuarastal bunasach meadhanach $112,923; leth meadhanach $103,334–$112,923.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$112,923
Leath mheadhanach nan tuarastalan$103,334–$112,923
Ceudail 10mh–90mh$102,698–$118,439

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20265$112,923

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$112,923–$130,000
Ìre II
Irving, TX3 Màrt 202616 Màrt 2026Dearbhaichte
$103,334–$120,000
Ìre II
Lebanon, TN23 Gearr 20262 Màrt 2026Dearbhaichte
$112,923–$120,000
Ìre II
Dallas, TX19 Gearr 20262 Màrt 2026Dearbhaichte
$122,117–$130,000
Ìre III
Lebanon, TN19 Gearr 20262 Màrt 2026Dearbhaichte
$102,274–$130,000
Ìre III
Centerton, AR19 Gearr 20262 Màrt 2026Dearbhaichte

Technical Project Lead aig gach neach-fastaidh →

Obraichean eile aig Insight Global, LLC

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).