Dachaigh › Luchd-obrach › Intel Corporation › Component Design Engineer
Component Design Engineer aig Intel Corporation: Tuarastalan H-1B
2,706 iarrtasan cumhaichean-obrach airson an dreuchd Component Design Engineer aig Intel Corporation. Tuarastal bunasach meadhanach $121,680; leth meadhanach $106,558–$139,710.
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 866 | $110,718 |
| FY2024 | 873 | $120,557 |
| FY2025 | 549 | $124,942 |
| FY2026 | 412 | $135,907 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $148,866–$190,800 Ìre III | Hillsboro, OR | 19 Ògmh 2026 | 18 Dùbh 2026 | Dearbhaichte |
| $133,827–$200,000 | Santa Clara, CA | 19 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $176,030–$221,140 Ìre IV | Hillsboro, OR | 19 Ògmh 2026 | 26 Ògmh 2026 | Dearbhaichte |
| $135,150–$190,800 | Hillsboro, OR | 19 Ògmh 2026 | 30 Samh 2026 | Dearbhaichte |
| $116,610–$164,630 Ìre II | Austin, TX | 16 Ògmh 2026 | 8 Dùbh 2026 | Dearbhaichte |
| $156,640–$221,140 Ìre III | Austin, TX | 15 Ògmh 2026 | 20 Samh 2026 | Dearbhaichte |
| $163,031–$230,400 | Santa Clara, CA | 15 Ògmh 2026 | 3 Dùbh 2026 | Dearbhaichte |
| $148,866–$190,800 Ìre III | Hillsboro, OR | 15 Ògmh 2026 | 3 Dùbh 2026 | Dearbhaichte |
| $141,910–$200,340 Ìre III | Folsom, CA | 15 Ògmh 2026 | 1 Dùbh 2026 | Dearbhaichte |
| $163,031–$230,400 | Santa Clara, CA | 12 Ògmh 2026 | 29 Sult 2026 | Dearbhaichte |
| $110,656–$142,040 Ìre II | Austin, TX | 11 Ògmh 2026 | 15 Ògmh 2026 | Dearbhaichte |
| $156,853–$200,000 Ìre II | Santa Clara, CA | 10 Ògmh 2026 | 16 Ògmh 2026 | Dearbhaichte |
| $133,827–$200,000 | Santa Clara, CA | 10 Ògmh 2026 | 15 Ògmh 2026 | Dearbhaichte |
| $166,504–$230,400 | Santa Clara, CA | 9 Ògmh 2026 | 7 Dùbh 2026 | Dearbhaichte |
| $156,640–$221,140 Ìre III | Austin, TX | 9 Ògmh 2026 | 8 Dùbh 2026 | Dearbhaichte |
| $116,610–$164,630 Ìre II | Fort Collins, CO | 9 Ògmh 2026 | 12 Ògmh 2026 | Dearbhaichte |
| $121,680–$164,630 Ìre II | Hillsboro, OR | 9 Ògmh 2026 | 8 Dùbh 2026 | Dearbhaichte |
| $148,866–$190,800 Ìre III | Hillsboro, OR | 9 Ògmh 2026 | 5 Dùbh 2026 | Dearbhaichte |
| $181,540–$256,300 Ìre IV | Hutto, TX | 9 Ògmh 2026 | 27 Samh 2026 | Dearbhaichte |
| $156,640–$221,140 Ìre III | Hillsboro, OR | 9 Ògmh 2026 | 26 Samh 2026 | Dearbhaichte |
| $135,907–$190,800 Ìre III | Austin, TX | 8 Ògmh 2026 | 26 Samh 2026 | Dearbhaichte |
| $181,540–$256,300 Ìre IV | Hillsboro, OR | 8 Ògmh 2026 | 7 Dùbh 2026 | Dearbhaichte |
| $186,472–$265,400 Ìre III | Santa Clara, CA | 8 Ògmh 2026 | 7 Dùbh 2026 | Dearbhaichte |
| $156,640–$221,140 Ìre III | Hillsboro, OR | 8 Ògmh 2026 | 7 Dùbh 2026 | Dearbhaichte |
| $122,440–$172,860 Ìre II | Folsom, CA | 8 Ògmh 2026 | 24 Samh 2026 | Dearbhaichte |
| $190,610–$269,100 Ìre IV | Folsom, CA | 8 Ògmh 2026 | 7 Dùbh 2026 | Dearbhaichte |
| $135,907–$190,800 Ìre III | Austin, TX | 8 Ògmh 2026 | 7 Dùbh 2026 | Dearbhaichte |
| $142,500–$201,100 Ìre III | Chandler, AZ | 5 Ògmh 2026 | 19 Samh 2026 | Dearbhaichte |
| $156,640–$221,140 | Hillsboro, OR | 5 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $121,680–$164,630 Ìre II | Hillsboro, OR | 5 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $156,640–$221,140 Ìre III | Austin, TX | 4 Ògmh 2026 | 9 Samh 2026 | Dearbhaichte |
| $148,866–$190,800 Ìre III | Hillsboro, OR | 4 Ògmh 2026 | 3 Dùbh 2026 | Dearbhaichte |
| $156,640–$221,140 Ìre III | Hillsboro, OR | 4 Ògmh 2026 | 3 Dùbh 2026 | Dearbhaichte |
| $176,030–$221,140 Ìre IV | Hillsboro, OR | 2 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $156,640–$221,140 Ìre III | Hillsboro, OR | 2 Ògmh 2026 | 8 Ògmh 2026 | Dearbhaichte |
| $176,030–$221,140 Ìre IV | Hillsboro, OR | 1 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $186,472–$265,400 Ìre III | Santa Clara, CA | 1 Ògmh 2026 | 25 Samh 2026 | Dearbhaichte |
| $135,907–$190,800 Ìre III | Austin, TX | 1 Ògmh 2026 | 24 Samh 2026 | Dearbhaichte |
| $176,030–$221,140 Ìre IV | Hillsboro, OR | 1 Ògmh 2026 | 25 Samh 2026 | Dearbhaichte |
| $186,472–$265,400 Ìre III | Santa Clara, CA | 1 Ògmh 2026 | 17 Samh 2026 | Dearbhaichte |
| $164,470–$232,190 Ìre III | Folsom, CA | 1 Ògmh 2026 | 25 Samh 2026 | Dearbhaichte |
| $181,540–$256,300 Ìre IV | Hillsboro, OR | 1 Ògmh 2026 | 24 Samh 2026 | Dearbhaichte |
| $148,866–$190,800 Ìre III | Hillsboro, OR | 1 Ògmh 2026 | 24 Samh 2026 | Dearbhaichte |
| $186,472–$230,400 Ìre III | San Jose, CA | 29 Cèit 2026 | 19 Iuch 2026 | Dearbhaichte |
| $156,640–$221,140 Ìre III | Austin, TX | 29 Cèit 2026 | 4 Ògmh 2026 | Dearbhaichte |
| $156,640–$221,140 Ìre III | Hillsboro, OR | 29 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $109,658–$142,040 Ìre II | Fort Collins, CO | 29 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $212,830–$300,470 Ìre IV | Chandler, AZ | 28 Cèit 2026 | 20 Samh 2026 | Dearbhaichte |
| $156,640–$221,140 Ìre III | Austin, TX | 28 Cèit 2026 | 13 Samh 2026 | Dearbhaichte |
| $160,803–$230,400 | Santa Clara, CA | 28 Cèit 2026 | 13 Samh 2026 | Dearbhaichte |
| $109,658–$142,040 Ìre II | Fort Collins, CO | 28 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $156,640–$221,140 Ìre III | Chandler, AZ | 27 Cèit 2026 | 26 Samh 2026 | Dearbhaichte |
| $156,640–$221,140 Ìre III | Austin, TX | 25 Cèit 2026 | 29 Cèit 2026 | Dearbhaichte |
| $135,907–$190,800 Ìre III | Leander, TX | 25 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $156,640–$221,140 Ìre III | Starkville, MS | 22 Cèit 2026 | 21 Samh 2026 | Dearbhaichte |
| $181,540–$256,300 Ìre IV | Lynnwood, WA | 21 Cèit 2026 | 18 Samh 2026 | Dearbhaichte |
| $121,680–$164,630 Ìre II | Hillsboro, OR | 19 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $116,610–$164,630 Ìre II | Fort Collins, CO | 19 Cèit 2026 | 21 Sult 2026 | Dearbhaichte |
| $160,803–$230,400 | Santa Clara, CA | 18 Cèit 2026 | 25 Cèit 2026 | Dearbhaichte |
| $181,540–$256,300 Ìre IV | Austin, TX | 18 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $148,866–$190,800 Ìre III | Hillsboro, OR | 17 Cèit 2026 | 16 Samh 2026 | Dearbhaichte |
| $164,470–$232,190 Ìre III | Folsom, CA | 17 Cèit 2026 | 16 Samh 2026 | Dearbhaichte |
| $186,472–$265,400 Ìre III | Santa Clara, CA | 17 Cèit 2026 | 16 Samh 2026 | Dearbhaichte |
| $190,610–$269,100 Ìre IV | San Diego, CA | 16 Cèit 2026 | 15 Samh 2026 | Dearbhaichte |
| $156,640–$221,140 Ìre III | Chandler, AZ | 16 Cèit 2026 | 10 Samh 2026 | Dearbhaichte |
| $216,091–$305,600 Ìre IV | Santa Clara, CA | 15 Cèit 2026 | 11 Samh 2026 | Dearbhaichte |
| $135,150–$190,800 Ìre III | Seven Fields, PA | 15 Cèit 2026 | 11 Dàmh 2026 | Dearbhaichte |
| $216,091–$305,600 Ìre IV | Santa Clara, CA | 15 Cèit 2026 | 6 Iuch 2026 | Dearbhaichte |
| $156,640–$221,140 Ìre III | Austin, TX | 14 Cèit 2026 | 10 Samh 2026 | Dearbhaichte |
| $164,470–$232,190 Ìre III | Folsom, CA | 14 Cèit 2026 | 10 Samh 2026 | Dearbhaichte |
| $156,640–$221,140 Ìre III | Hillsboro, OR | 14 Cèit 2026 | 9 Samh 2026 | Dearbhaichte |
| $156,640–$221,140 Ìre III | Hillsboro, OR | 14 Cèit 2026 | 9 Samh 2026 | Dearbhaichte |
| $142,500–$201,100 Ìre III | Austin, TX | 14 Cèit 2026 | 20 Cèit 2026 | Dearbhaichte |
| $121,680–$164,630 Ìre II | Hillsboro, OR | 13 Cèit 2026 | 7 Samh 2026 | Dearbhaichte |
| $121,680–$164,630 Ìre II | Hillsboro, OR | 13 Cèit 2026 | 10 Dàmh 2026 | Dearbhaichte |
| $160,803–$230,400 | Santa Clara, CA | 13 Cèit 2026 | 19 Cèit 2026 | Dearbhaichte |
| $148,054–$190,800 Ìre III | Boxborough, MA | 12 Cèit 2026 | 24 Dàmh 2026 | Dearbhaichte |
| $148,866–$190,800 Ìre III | Hillsboro, OR | 12 Cèit 2026 | 5 Samh 2026 | Dearbhaichte |
| $156,640–$221,140 Ìre III | Boxborough, MA | 12 Cèit 2026 | 2 Samh 2026 | Dearbhaichte |
| $116,610–$164,630 Ìre II | Austin, TX | 9 Cèit 2026 | 2 Lùna 2026 | Dearbhaichte |
| $122,440–$172,860 Ìre II | Folsom, CA | 8 Cèit 2026 | 14 Cèit 2026 | Dearbhaichte |
| $133,400–$200,000 | Santa Clara, CA | 8 Cèit 2026 | 14 Cèit 2026 | Dearbhaichte |
| $160,803–$230,400 | Santa Clara, CA | 8 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $156,640–$221,140 | Hillsboro, OR | 8 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $216,091–$265,400 Ìre IV | Santa Clara, CA | 8 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $152,048–$200,340 Ìre IV | Folsom, CA | 8 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $164,470–$232,190 Ìre IV | Tracy, CA | 7 Cèit 2026 | 13 Cèit 2026 | Dearbhaichte |
| $150,509–$190,800 Ìre IV | Sanford, FL | 5 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $176,030–$221,140 Ìre IV | Hillsboro, OR | 5 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $122,440–$172,860 Ìre II | Folsom, CA | 5 Cèit 2026 | 10 Cèit 2026 | Dearbhaichte |
| $135,150–$190,800 | Hillsboro, OR | 4 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $122,440–$172,860 Ìre II | Folsom, CA | 29 Gibl 2026 | 8 Lùna 2026 | Dearbhaichte |
| $135,150–$190,800 | Hillsboro, OR | 25 Gibl 2026 | 29 Gibl 2026 | Dearbhaichte |
| $124,342–$142,040 Ìre II | Boxborough, MA | 25 Gibl 2026 | 19 Sult 2026 | Dearbhaichte |
| $116,610–$164,630 Ìre II | Austin, TX | 25 Gibl 2026 | 29 Gibl 2026 | Dearbhaichte |
| $138,715–$190,800 Ìre III | Chandler, AZ | 24 Gibl 2026 | 1 Cèit 2026 | Dearbhaichte |
| $181,540–$256,300 Ìre IV | Hillsboro, OR | 24 Gibl 2026 | 7 Sult 2026 | Dearbhaichte |
| $124,342–$142,040 Ìre II | Boxborough, MA | 20 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $114,234–$142,040 Ìre II | Chandler, AZ | 20 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $116,610–$164,630 Ìre II | Austin, TX | 20 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $156,853–$200,000 Ìre II | Santa Clara, CA | 16 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $186,472–$257,000 Ìre III | Santa Clara, CA | 14 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $141,910–$200,340 Ìre III | Seattle, WA | 14 Gibl 2026 | 11 Dàmh 2026 | Dearbhaichte |
| $129,772–$173,700 | Santa Clara, CA | 14 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $116,610–$164,630 Ìre II | Austin, TX | 10 Gibl 2026 | 26 Sult 2026 | Dearbhaichte |
| $116,610–$164,630 Ìre II | Austin, TX | 8 Gibl 2026 | 26 Sult 2026 | Dearbhaichte |
| $124,342–$141,040 Ìre II | Boxborough, MA | 7 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $186,472–$256,680 Ìre III | Santa Clara, CA | 7 Gibl 2026 | 6 Dàmh 2026 | Dearbhaichte |
| $186,070–$262,680 Ìre IV | Bellevue, WA | 7 Gibl 2026 | 14 Gibl 2026 | Dearbhaichte |
| $121,680–$162,760 Ìre II | Hillsboro, OR | 7 Gibl 2026 | 6 Dàmh 2026 | Dearbhaichte |
| $115,290–$162,760 Ìre II | Austin, TX | 7 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $121,050–$170,890 Ìre II | Folsom, CA | 7 Gibl 2026 | 25 Sult 2026 | Dearbhaichte |
| $186,472–$256,680 Ìre III | Santa Clara, CA | 7 Gibl 2026 | 28 Ògmh 2026 | Dearbhaichte |
| $156,853–$197,210 Ìre II | Santa Clara, CA | 6 Gibl 2026 | 5 Dàmh 2026 | Dearbhaichte |
| $115,290–$162,760 Ìre II | Austin, TX | 6 Gibl 2026 | 14 Iuch 2026 | Dearbhaichte |
| $121,680–$162,760 Ìre II | Hillsboro, OR | 6 Gibl 2026 | 30 Sult 2026 | Dearbhaichte |
| $115,290–$162,760 Ìre II | Austin, TX | 6 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $216,091–$292,840 Ìre IV | Santa Clara, CA | 6 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $148,866–$187,840 Ìre III | Hillsboro, OR | 6 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $129,772–$172,860 | Santa Clara, CA | 2 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $153,540–$216,770 Ìre III | Hillsboro, OR | 2 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $186,472–$256,680 Ìre III | Santa Clara, CA | 2 Gibl 2026 | 20 Sult 2026 | Dearbhaichte |
| $186,472–$256,680 Ìre III | Santa Clara, CA | 1 Gibl 2026 | 30 Sult 2026 | Dearbhaichte |
| $171,120–$256,680 | Santa Clara, CA | 1 Gibl 2026 | 21 Gibl 2026 | Dearbhaichte |
| $124,342–$141,040 Ìre II | Boxborough, MA | 1 Gibl 2026 | 19 Sult 2026 | Dearbhaichte |
| $121,680–$141,040 Ìre II | Hillsboro, OR | 27 Màrt 2026 | 28 Ògmh 2026 | Dearbhaichte |
| $166,504–$224,990 | Santa Clara, CA | 27 Màrt 2026 | 20 Sult 2026 | Dearbhaichte |
| $109,658–$141,040 Ìre II | Fort Collins, CO | 27 Màrt 2026 | 14 Lùna 2026 | Dearbhaichte |
| $100,807–$141,040 | Hillsboro, OR | 26 Màrt 2026 | 22 Sult 2026 | Dearbhaichte |
| $135,907–$187,840 Ìre III | Austin, TX | 26 Màrt 2026 | 25 Sult 2026 | Dearbhaichte |
| $156,853–$172,860 Ìre II | Santa Clara, CA | 26 Màrt 2026 | 20 Sult 2026 | Dearbhaichte |
| $115,290–$162,760 Ìre II | Austin, TX | 26 Màrt 2026 | 18 Sult 2026 | Dearbhaichte |
| $109,658–$141,040 Ìre II | Fort Collins, CO | 26 Màrt 2026 | 17 Sult 2026 | Dearbhaichte |
| $125,158–$172,860 | Santa Clara, CA | 25 Màrt 2026 | 23 Sult 2026 | Dearbhaichte |
| $125,158–$172,860 | Santa Clara, CA | 25 Màrt 2026 | 18 Sult 2026 | Dearbhaichte |
| $186,472–$224,990 Ìre III | Santa Clara, CA | 25 Màrt 2026 | 24 Sult 2026 | Dearbhaichte |
| $100,807–$141,040 | Hillsboro, OR | 25 Màrt 2026 | 24 Sult 2026 | Dearbhaichte |
| $166,504–$224,990 | Santa Clara, CA | 25 Màrt 2026 | 22 Sult 2026 | Dearbhaichte |
| $125,158–$172,860 | Santa Clara, CA | 25 Màrt 2026 | 15 Sult 2026 | Dearbhaichte |
| $216,091–$292,840 Ìre IV | Santa Clara, CA | 25 Màrt 2026 | 24 Sult 2026 | Dearbhaichte |
| $125,158–$172,860 | Santa Clara, CA | 25 Màrt 2026 | 16 Sult 2026 | Dearbhaichte |
| $106,985–$141,040 | Austin, TX | 24 Màrt 2026 | 23 Sult 2026 | Dearbhaichte |
| $156,209–$224,990 | Santa Clara, CA | 24 Màrt 2026 | 23 Sult 2026 | Dearbhaichte |
| $153,540–$216,770 Ìre III | Chicago, IL | 24 Màrt 2026 | 28 Màrt 2026 | Dearbhaichte |
| $121,680–$141,040 Ìre II | Hillsboro, OR | 24 Màrt 2026 | 23 Sult 2026 | Dearbhaichte |
| $153,540–$216,770 Ìre III | Hillsboro, OR | 23 Màrt 2026 | 19 Sult 2026 | Dearbhaichte |
| $135,907–$187,840 Ìre III | Austin, TX | 23 Màrt 2026 | 30 Màrt 2026 | Dearbhaichte |
| $125,158–$172,860 | Santa Clara, CA | 17 Màrt 2026 | 14 Sult 2026 | Dearbhaichte |
| $121,050–$170,890 Ìre II | Folsom, CA | 17 Màrt 2026 | 12 Sult 2026 | Dearbhaichte |
| $109,658–$141,040 Ìre II | Fort Collins, CO | 14 Màrt 2026 | 9 Sult 2026 | Dearbhaichte |
| $131,470–$197,210 | Santa Clara, CA | 14 Màrt 2026 | 9 Sult 2026 | Dearbhaichte |
| $106,985–$141,040 | Austin, TX | 14 Màrt 2026 | 11 Sult 2026 | Diùltadh |
| $131,470–$197,210 | Santa Clara, CA | 13 Màrt 2026 | 12 Sult 2026 | Dearbhaichte |
| $125,158–$172,860 | Santa Clara, CA | 13 Màrt 2026 | 12 Sult 2026 | Dearbhaichte |
| $161,230–$227,620 Ìre III | Folsom, CA | 13 Màrt 2026 | 12 Sult 2026 | Dearbhaichte |
| $121,680–$141,040 Ìre II | Hillsboro, OR | 12 Màrt 2026 | 9 Sult 2026 | Dearbhaichte |
| $100,807–$141,040 | Hillsboro, OR | 12 Màrt 2026 | 11 Sult 2026 | Dearbhaichte |
| $186,472–$256,680 Ìre III | Santa Clara, CA | 11 Màrt 2026 | 21 Gibl 2026 | Dearbhaichte |
| $157,602–$216,770 Ìre III | Austin, TX | 11 Màrt 2026 | 16 Màrt 2026 | Dearbhaichte |
| $115,290–$162,760 Ìre II | Austin, TX | 11 Màrt 2026 | 16 Màrt 2026 | Dearbhaichte |
| $125,158–$172,860 | Santa Clara, CA | 10 Màrt 2026 | 5 Sult 2026 | Dearbhaichte |
| $135,907–$187,840 Ìre III | Austin, TX | 9 Màrt 2026 | 28 Ògmh 2026 | Dearbhaichte |
| $124,342–$141,040 Ìre II | Boxborough, MA | 9 Màrt 2026 | 21 Lùna 2026 | Dearbhaichte |
| $177,200–$250,160 Ìre IV | Austin, TX | 6 Màrt 2026 | 4 Sult 2026 | Dearbhaichte |
| $153,540–$216,770 Ìre III | Hillsboro, OR | 5 Màrt 2026 | 2 Sult 2026 | Dearbhaichte |
| $135,907–$187,840 Ìre III | Austin, TX | 4 Màrt 2026 | 27 Lùna 2026 | Dearbhaichte |
| $110,656–$141,040 Ìre II | Austin, TX | 3 Màrt 2026 | 26 Lùna 2026 | Dearbhaichte |
| $131,470–$197,210 | Santa Clara, CA | 3 Màrt 2026 | 10 Màrt 2026 | Dearbhaichte |
| $115,290–$162,760 Ìre II | Austin, TX | 3 Màrt 2026 | 28 Lùna 2026 | Dearbhaichte |
| $121,680–$141,040 Ìre II | Hillsboro, OR | 2 Màrt 2026 | 1 Sult 2026 | Dearbhaichte |
| $131,470–$197,210 | Santa Clara, CA | 2 Màrt 2026 | 1 Sult 2026 | Dearbhaichte |
| $121,680–$162,760 Ìre II | Hillsboro, OR | 1 Màrt 2026 | 26 Lùna 2026 | Dearbhaichte |
| $109,658–$141,040 Ìre II | Fort Collins, CO | 28 Gearr 2026 | 27 Lùna 2026 | Dearbhaichte |
| $121,680–$162,760 Ìre II | Hillsboro, OR | 28 Gearr 2026 | 25 Lùna 2026 | Dearbhaichte |
| $110,656–$141,040 Ìre II | Austin, TX | 28 Gearr 2026 | 24 Lùna 2026 | Dearbhaichte |
| $125,158–$172,860 | Santa Clara, CA | 28 Gearr 2026 | 25 Lùna 2026 | Dearbhaichte |
| $121,680–$162,760 Ìre II | Hillsboro, OR | 26 Gearr 2026 | 24 Lùna 2026 | Dearbhaichte |
| $115,290–$162,760 Ìre II | Austin, TX | 25 Gearr 2026 | 17 Lùna 2026 | Dearbhaichte |
| $115,290–$162,760 Ìre II | Leander, TX | 25 Gearr 2026 | 20 Lùna 2026 | Dearbhaichte |
| $135,907–$187,840 Ìre III | Austin, TX | 25 Gearr 2026 | 4 Màrt 2026 | Dearbhaichte |
| $153,540–$216,770 Ìre III | Hillsboro, OR | 24 Gearr 2026 | 2 Màrt 2026 | Dearbhaichte |
| $110,656–$141,040 Ìre II | Austin, TX | 24 Gearr 2026 | 19 Lùna 2026 | Dearbhaichte |
| $153,540–$216,770 Ìre III | Hillsboro, OR | 23 Gearr 2026 | 22 Lùna 2026 | Dearbhaichte |
| $124,342–$162,760 Ìre II | Boxborough, MA | 20 Gearr 2026 | 19 Lùna 2026 | Dearbhaichte |
| $115,290–$162,760 Ìre II | Austin, TX | 20 Gearr 2026 | 19 Lùna 2026 | Dearbhaichte |
| $216,091–$292,840 Ìre IV | Santa Clara, CA | 20 Gearr 2026 | 20 Lùna 2026 | Dearbhaichte |
| $121,050–$170,890 Ìre II | Folsom, CA | 20 Gearr 2026 | 12 Lùna 2026 | Dearbhaichte |
| $125,158–$172,860 | Santa Clara, CA | 20 Gearr 2026 | 18 Lùna 2026 | Dearbhaichte |
| $125,158–$172,860 | Santa Clara, CA | 19 Gearr 2026 | 15 Lùna 2026 | Dearbhaichte |
| $186,472–$256,680 Ìre III | Santa Clara, CA | 19 Gearr 2026 | 16 Lùna 2026 | Dearbhaichte |
| $177,200–$250,160 Ìre IV | Hillsboro, OR | 18 Gearr 2026 | 17 Lùna 2026 | Dearbhaichte |
| $115,290–$162,760 Ìre II | Austin, TX | 18 Gearr 2026 | 15 Lùna 2026 | Dearbhaichte |
| $110,656–$141,040 Ìre II | Austin, TX | 16 Gearr 2026 | 12 Lùna 2026 | Dearbhaichte |
| $115,290–$162,760 Ìre II | Austin, TX | 15 Gearr 2026 | 15 Lùna 2026 | Dearbhaichte |
| $115,290–$162,760 Ìre II | Atlanta, GA | 13 Gearr 2026 | 9 Lùna 2026 | Dearbhaichte |
| $140,858–$187,840 Ìre III | Everett, WA | 13 Gearr 2026 | 11 Lùna 2026 | Dearbhaichte |
| $153,540–$216,770 Ìre III | Hillsboro, OR | 12 Gearr 2026 | 11 Lùna 2026 | Dearbhaichte |
| $131,470–$197,210 | Santa Clara, CA | 12 Gearr 2026 | 10 Lùna 2026 | Dearbhaichte |
| $153,540–$216,770 Ìre III | Hillsboro, OR | 9 Gearr 2026 | 4 Lùna 2026 | Dearbhaichte |
| $121,680–$162,760 Ìre II | Hillsboro, OR | 9 Gearr 2026 | 5 Lùna 2026 | Dearbhaichte |
| $177,200–$250,160 Ìre IV | Austin, TX | 9 Gearr 2026 | 13 Gearr 2026 | Dearbhaichte |
| $153,540–$216,770 Ìre III | Hillsboro, OR | 9 Gearr 2026 | 1 Lùna 2026 | Dearbhaichte |
| $135,907–$187,840 Ìre III | Austin, TX | 6 Gearr 2026 | 5 Lùna 2026 | Dearbhaichte |
| $153,540–$216,770 Ìre III | Austin, TX | 6 Gearr 2026 | 2 Lùna 2026 | Dearbhaichte |
| $131,470–$197,210 | Santa Clara, CA | 5 Gearr 2026 | 1 Lùna 2026 | Dearbhaichte |
| $131,470–$197,210 | Santa Clara, CA | 5 Gearr 2026 | 4 Lùna 2026 | Dearbhaichte |
| $153,540–$216,770 Ìre III | Austin, TX | 5 Gearr 2026 | 10 Gearr 2026 | Dearbhaichte |
| $121,680–$141,040 Ìre II | Hillsboro, OR | 5 Gearr 2026 | 3 Lùna 2026 | Dearbhaichte |
| $115,290–$162,760 Ìre II | Austin, TX | 5 Gearr 2026 | 3 Lùna 2026 | Dearbhaichte |
| $100,807–$141,040 | Hillsboro, OR | 5 Gearr 2026 | 2 Lùna 2026 | Dearbhaichte |
| $156,209–$224,990 | Santa Clara, CA | 5 Gearr 2026 | 1 Lùna 2026 | Dearbhaichte |
| $133,050–$187,840 | Hillsboro, OR | 4 Gearr 2026 | 3 Lùna 2026 | Dearbhaichte |
| $125,158–$172,860 | Santa Clara, CA | 4 Gearr 2026 | 1 Lùna 2026 | Dearbhaichte |
| $131,470–$197,210 | Santa Clara, CA | 4 Gearr 2026 | 1 Lùna 2026 | Dearbhaichte |
| $121,680–$162,760 Ìre II | Hillsboro, OR | 4 Gearr 2026 | 30 Iuch 2026 | Dearbhaichte |
| $125,158–$172,860 | Santa Clara, CA | 4 Gearr 2026 | 28 Iuch 2026 | Dearbhaichte |
| $125,158–$172,860 | Santa Clara, CA | 4 Gearr 2026 | 1 Lùna 2026 | Dearbhaichte |
| $133,050–$187,840 Ìre III | Sanford, FL | 4 Gearr 2026 | 29 Iuch 2026 | Dearbhaichte |
| $166,504–$224,990 | Santa Clara, CA | 3 Gearr 2026 | 1 Lùna 2026 | Dearbhaichte |
| $156,853–$197,210 Ìre II | Santa Clara, CA | 3 Gearr 2026 | 30 Iuch 2026 | Dearbhaichte |
| $161,230–$227,620 Ìre III | Folsom, CA | 3 Gearr 2026 | 10 Gearr 2026 | Dearbhaichte |
| $109,658–$141,040 Ìre II | Fort Collins, CO | 3 Gearr 2026 | 29 Iuch 2026 | Dearbhaichte |
| $135,429–$197,210 | Santa Clara, CA | 3 Gearr 2026 | 28 Iuch 2026 | Dearbhaichte |
| $121,680–$162,760 Ìre II | Hillsboro, OR | 2 Gearr 2026 | 28 Iuch 2026 | Dearbhaichte |
| $115,290–$162,760 Ìre II | Austin, TX | 2 Gearr 2026 | 28 Iuch 2026 | Dearbhaichte |
| $121,680–$162,760 Ìre II | Hillsboro, OR | 2 Gearr 2026 | 23 Iuch 2026 | Dearbhaichte |
| $115,290–$162,760 | Hillsboro, OR | 31 Faoi 2026 | 30 Iuch 2026 | Dearbhaichte |
| $125,158–$172,860 | Santa Clara, CA | 31 Faoi 2026 | 27 Iuch 2026 | Dearbhaichte |
| $125,158–$172,860 | Santa Clara, CA | 31 Faoi 2026 | 27 Iuch 2026 | Dearbhaichte |
| $113,942–$148,080 Ìre II | Folsom, CA | 31 Faoi 2026 | 28 Iuch 2026 | Dearbhaichte |
| $124,342–$141,040 Ìre II | Boxborough, MA | 31 Faoi 2026 | 28 Iuch 2026 | Dearbhaichte |
| $100,807–$141,040 | Hillsboro, OR | 31 Faoi 2026 | 30 Iuch 2026 | Dearbhaichte |
| $125,158–$172,860 | Santa Clara, CA | 31 Faoi 2026 | 28 Iuch 2026 | Dearbhaichte |
| $125,158–$172,860 | Santa Clara, CA | 30 Faoi 2026 | 27 Iuch 2026 | Dearbhaichte |
| $186,472–$256,680 Ìre III | Santa Clara, CA | 30 Faoi 2026 | 28 Ògmh 2026 | Dearbhaichte |
| $115,290–$162,760 Ìre II | Chandler, AZ | 29 Faoi 2026 | 27 Iuch 2026 | Dearbhaichte |
| $186,070–$262,680 Ìre IV | Folsom, CA | 29 Faoi 2026 | 27 Iuch 2026 | Dearbhaichte |
| $115,290–$162,760 Ìre II | Austin, TX | 29 Faoi 2026 | 4 Gearr 2026 | Dearbhaichte |
| $177,200–$250,160 Ìre IV | Hillsboro, OR | 29 Faoi 2026 | 26 Iuch 2026 | Dearbhaichte |
| $186,472–$256,680 Ìre III | Santa Clara, CA | 29 Faoi 2026 | 29 Iuch 2026 | Dearbhaichte |
| $135,907–$187,840 Ìre III | Austin, TX | 29 Faoi 2026 | 19 Iuch 2026 | Dearbhaichte |
| $148,866–$187,840 Ìre III | Hillsboro, OR | 29 Faoi 2026 | 26 Iuch 2026 | Dearbhaichte |
| $153,540–$216,770 Ìre III | Fort Collins, CO | 28 Faoi 2026 | 1 Gearr 2026 | Dearbhaichte |
| $148,866–$187,840 Ìre III | Hillsboro, OR | 28 Faoi 2026 | 20 Iuch 2026 | Dearbhaichte |
| $110,656–$141,040 Ìre II | Austin, TX | 28 Faoi 2026 | 22 Iuch 2026 | Dearbhaichte |
| $121,050–$170,890 Ìre II | Folsom, CA | 27 Faoi 2026 | 21 Iuch 2026 | Dearbhaichte |
| $139,710–$197,230 Ìre III | Folsom, CA | 27 Faoi 2026 | 21 Iuch 2026 | Dearbhaichte |
| $177,200–$250,160 Ìre IV | Hillsboro, OR | 27 Faoi 2026 | 21 Iuch 2026 | Dearbhaichte |
| $153,540–$216,770 Ìre III | Marietta, GA | 27 Faoi 2026 | 26 Iuch 2026 | Dearbhaichte |
| $125,158–$172,860 | Santa Clara, CA | 27 Faoi 2026 | 22 Iuch 2026 | Dearbhaichte |
| $115,290–$162,760 Ìre II | Austin, TX | 27 Faoi 2026 | 26 Iuch 2026 | Dearbhaichte |
| $131,470–$197,210 | Santa Clara, CA | 27 Faoi 2026 | 20 Iuch 2026 | Dearbhaichte |
| $115,290–$162,760 Ìre II | Austin, TX | 27 Faoi 2026 | 22 Iuch 2026 | Dearbhaichte |
| $121,680–$162,760 Ìre II | Hillsboro, OR | 27 Faoi 2026 | 25 Iuch 2026 | Dearbhaichte |
| $121,680–$162,760 Ìre II | Hillsboro, OR | 24 Faoi 2026 | 12 Iuch 2026 | Dearbhaichte |
| $186,472–$256,680 Ìre III | Santa Clara, CA | 23 Faoi 2026 | 19 Iuch 2026 | Dearbhaichte |
| $133,050–$187,840 | Hillsboro, OR | 23 Faoi 2026 | 19 Iuch 2026 | Dearbhaichte |
| $121,680–$141,040 Ìre II | Hillsboro, OR | 23 Faoi 2026 | 22 Iuch 2026 | Dearbhaichte |
| $121,050–$170,890 Ìre II | Folsom, CA | 23 Faoi 2026 | 20 Iuch 2026 | Dearbhaichte |
| $110,656–$141,040 Ìre II | Austin, TX | 23 Faoi 2026 | 22 Iuch 2026 | Dearbhaichte |
| $156,209–$224,990 | Santa Clara, CA | 23 Faoi 2026 | 19 Iuch 2026 | Dearbhaichte |
| $133,050–$187,840 | Hillsboro, OR | 23 Faoi 2026 | 22 Iuch 2026 | Dearbhaichte |
| $133,050–$187,840 | Hillsboro, OR | 22 Faoi 2026 | 21 Iuch 2026 | Dearbhaichte |
| $153,540–$216,770 Ìre III | Austin, TX | 22 Faoi 2026 | 21 Iuch 2026 | Dearbhaichte |
| $140,858–$197,230 Ìre III | Bellevue, WA | 22 Faoi 2026 | 18 Iuch 2026 | Dearbhaichte |
| $156,209–$256,680 | Santa Clara, CA | 22 Faoi 2026 | 26 Faoi 2026 | Dearbhaichte |
| $135,907–$187,840 Ìre III | Austin, TX | 22 Faoi 2026 | 26 Faoi 2026 | Dearbhaichte |
| $156,209–$224,990 | Santa Clara, CA | 22 Faoi 2026 | 22 Iuch 2026 | Dearbhaichte |
| $139,710–$197,230 Ìre III | Folsom, CA | 22 Faoi 2026 | 21 Iuch 2026 | Dearbhaichte |
| $110,656–$141,040 Ìre II | Austin, TX | 22 Faoi 2026 | 21 Iuch 2026 | Dearbhaichte |
| $115,290–$162,760 Ìre II | Austin, TX | 22 Faoi 2026 | 19 Iuch 2026 | Dearbhaichte |
| $148,866–$187,840 Ìre III | Hillsboro, OR | 22 Faoi 2026 | 21 Iuch 2026 | Dearbhaichte |
| $153,540–$216,770 Ìre III | Austin, TX | 22 Faoi 2026 | 19 Iuch 2026 | Dearbhaichte |
| $100,807–$141,040 | Hillsboro, OR | 21 Faoi 2026 | 22 Iuch 2026 | Dearbhaichte |
| $156,209–$224,990 | Santa Clara, CA | 21 Faoi 2026 | 15 Iuch 2026 | Dearbhaichte |
| $121,680–$162,760 Ìre II | Hillsboro, OR | 21 Faoi 2026 | 20 Iuch 2026 | Dearbhaichte |
| $148,866–$187,840 Ìre III | Hillsboro, OR | 21 Faoi 2026 | 14 Iuch 2026 | Dearbhaichte |
| $139,710–$197,230 Ìre III | Folsom, CA | 21 Faoi 2026 | 20 Iuch 2026 | Dearbhaichte |
| $139,710–$197,230 Ìre III | Folsom, CA | 21 Faoi 2026 | 20 Iuch 2026 | Dearbhaichte |
| $140,858–$187,840 Ìre III | Bothell, WA | 21 Faoi 2026 | 14 Iuch 2026 | Dearbhaichte |
| $153,540–$216,770 Ìre III | Hillsboro, OR | 21 Faoi 2026 | 20 Iuch 2026 | Dearbhaichte |
| $153,540–$216,770 Ìre III | Redmond, WA | 21 Faoi 2026 | 20 Iuch 2026 | Dearbhaichte |
| $125,158–$172,860 | Santa Clara, CA | 21 Faoi 2026 | 20 Iuch 2026 | Dearbhaichte |
| $113,942–$148,080 Ìre II | Folsom, CA | 20 Faoi 2026 | 27 Faoi 2026 | Dearbhaichte |
| $216,091–$292,840 Ìre IV | Santa Clara, CA | 19 Faoi 2026 | 26 Faoi 2026 | Dearbhaichte |
| $110,656–$141,040 Ìre II | Austin, TX | 16 Faoi 2026 | 14 Iuch 2026 | Dearbhaichte |
| $100,807–$162,760 | Hillsboro, OR | 16 Faoi 2026 | 14 Iuch 2026 | Dearbhaichte |
| $135,907–$187,840 Ìre III | Austin, TX | 16 Faoi 2026 | 5 Iuch 2026 | Dearbhaichte |
| $100,807–$141,040 | Hillsboro, OR | 16 Faoi 2026 | 15 Iuch 2026 | Dearbhaichte |
| $156,853–$197,210 Ìre II | Santa Clara, CA | 16 Faoi 2026 | 13 Iuch 2026 | Dearbhaichte |
| $100,807–$141,040 | Hillsboro, OR | 16 Faoi 2026 | 13 Iuch 2026 | Dearbhaichte |
| $125,158–$197,210 | Santa Clara, CA | 16 Faoi 2026 | 14 Iuch 2026 | Dearbhaichte |
| $156,209–$256,680 | Santa Clara, CA | 16 Faoi 2026 | 14 Iuch 2026 | Dearbhaichte |
| $119,061–$216,770 | Hillsboro, OR | 16 Faoi 2026 | 14 Iuch 2026 | Dearbhaichte |
| $132,995–$227,620 Ìre III | Folsom, CA | 15 Faoi 2026 | 14 Iuch 2026 | Dearbhaichte |
| $113,942–$170,890 Ìre II | Folsom, CA | 15 Faoi 2026 | 14 Iuch 2026 | Dearbhaichte |
| $125,158–$172,860 | Santa Clara, CA | 13 Faoi 2026 | 1 Iuch 2026 | Dearbhaichte |
| $100,807–$141,040 | Hillsboro, OR | 13 Faoi 2026 | 13 Iuch 2026 | Dearbhaichte |
| $115,290–$162,760 Ìre II | Austin, TX | 13 Faoi 2026 | 6 Iuch 2026 | Dearbhaichte |
| $121,680–$162,760 Ìre II | Hillsboro, OR | 13 Faoi 2026 | 13 Iuch 2026 | Dearbhaichte |
A’ sealltainn na 300 iarrtasan as ùire de 2,706.
Component Design Engineer aig gach neach-fastaidh →
Obraichean eile aig Intel Corporation
- Process Engineer$115,482
- Software Engineer$128,367
- Graphics Hardware Engineer$126,464
- Packaging Engineer$108,035
- Engineering Manager$179,650
- Analog Engineer$121,680
- Product Engineer$113,922
- System Validation Engineer$115,290
- Data Scientist$117,590
- Research Scientist$138,445
- Graphics Software Engineer$135,324
- Program Manager Technical$117,300
- Quality Reliability Engineer$103,355
- Firmware Engineer$127,878
- Application Engineer$137,730
- Industrial Engineer$92,102
- Test R&D Engineer$103,147
- Hardware Engineer$131,531
- SoC Design Engineer$182,832
- Failure Analysis Engineer$95,763
- Security Researcher$130,160
- Operations Research Engineer$79,130
- Facilities Engineer$92,581
- Product Marketing Engineer$125,486
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).