Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Intercontinental Exchange Holdings, Inc. › Lead Engineer, Storage Engineering

Lead Engineer, Storage Engineering aig Intercontinental Exchange Holdings, Inc.: Tuarastalan H-1B

7 iarrtasan cumhaichean-obrach airson an dreuchd Lead Engineer, Storage Engineering aig Intercontinental Exchange Holdings, Inc.. Tuarastal bunasach meadhanach $119,900; leth meadhanach $115,200–$134,850.

Iarrtasan (LCAs)7
Tuarastal meadhanach a chaidh a thabhann$119,900
Leath mheadhanach nan tuarastalan$115,200–$134,850
Ceudail 10mh–90mh$113,400–$149,800

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$113,400
FY20242$119,900
FY20252$149,800
FY20261$117,000

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$117,000–$162,600
Ìre IV
Atlanta, GA18 Cèit 20261 Dàmh 2026Dearbhaichte
$149,800–$152,600
Ìre IV
Johns Creek, GA29 Gibl 20251 Dàmh 2025Dearbhaichte
$149,800–$152,600
Ìre IV
Atlanta, GA29 Gibl 20251 Dàmh 2025Dearbhaichte
$119,900–$135,000
Ìre IV
Johns Creek, GA18 Màrt 20241 Sult 2024Dearbhaichte
$119,900–$135,000
Ìre IV
Atlanta, GA18 Màrt 20241 Sult 2024Dearbhaichte
$113,400–$135,000
Ìre IV
Atlanta, GA20 Màrt 20237 Sult 2023Dearbhaichte
$113,400–$135,000
Ìre IV
Johns Creek, GA20 Màrt 20237 Sult 2023Dearbhaichte

Obraichean eile aig Intercontinental Exchange Holdings, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).