Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Intuitive Surgical Operations, Inc. › Electrical Engineer

Electrical Engineer aig Intuitive Surgical Operations, Inc.: Tuarastalan H-1B

7 iarrtasan cumhaichean-obrach airson an dreuchd Electrical Engineer aig Intuitive Surgical Operations, Inc.. Tuarastal bunasach meadhanach $132,746; leth meadhanach $127,094–$142,023.

Iarrtasan (LCAs)7
Tuarastal meadhanach a chaidh a thabhann$132,746
Leath mheadhanach nan tuarastalan$127,094–$142,023
Ceudail 10mh–90mh$125,956–$157,911

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$128,502
FY20242$127,094
FY20252$142,023
FY20261$168,100

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$168,100–$241,900
Ìre II
Sunnyvale, CA28 Gibl 20261 Dàmh 2026Dearbhaichte
$151,118–$182,900Sunnyvale, CA18 Dùbh 202430 Cèit 2025Dearbhaichte
$132,928–$182,900Sunnyvale, CA18 Samh 202416 Cèit 2025Dearbhaichte
$127,100–$182,900
Ìre I
Sunnyvale, CA9 Gibl 20244 Dàmh 2024Dearbhaichte
$127,088–$143,047Sunnyvale, CA16 Dàmh 202323 Dùbh 2023Dearbhaichte
$124,259–$151,242
Ìre II
Sunnyvale, CA5 Gibl 202313 Cèit 2023Dearbhaichte
$132,746–$154,700
Ìre III
Sunnyvale, CA13 Gearr 202011 Lùna 2020Dearbhaichte, an uair sin air a tharraing air ais

Electrical Engineer aig gach neach-fastaidh →

Obraichean eile aig Intuitive Surgical Operations, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).