Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Invesco Group Services, Inc. › Advanced Engineer, Distrib Tech

Advanced Engineer, Distrib Tech aig Invesco Group Services, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Advanced Engineer, Distrib Tech aig Invesco Group Services, Inc.. Tuarastal bunasach meadhanach $130,000; leth meadhanach $130,000–$139,882.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$130,000
Leath mheadhanach nan tuarastalan$130,000–$139,882
Ceudail 10mh–90mh$127,000–$140,073

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20233$130,000
FY20241$125,000
FY20251$139,882

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$139,882
Ìre III
Atlanta, GA6 Ògmh 202514 Dàmh 2025Dearbhaichte
$125,000
Ìre III
Houston, TX6 Samh 202330 Samh 2023Dearbhaichte
$130,000
Ìre III
Dallas, TX8 Ògmh 20238 Ògmh 2023Dearbhaichte
$140,200
Ìre IV
Atlanta, GA11 Dùbh 202215 Cèit 2023Dearbhaichte
$130,000
Ìre IV
Harris, TX23 Samh 202230 Dùbh 2022Dearbhaichte

Obraichean eile aig Invesco Group Services, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).