Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Jabil Inc. › Information Technology Technical Lead

Information Technology Technical Lead aig Jabil Inc.: Tuarastalan H-1B

11 iarrtasan cumhaichean-obrach airson an dreuchd Information Technology Technical Lead aig Jabil Inc.. Tuarastal bunasach meadhanach $124,363; leth meadhanach $121,100–$131,118.

Iarrtasan (LCAs)11
Tuarastal meadhanach a chaidh a thabhann$124,363
Leath mheadhanach nan tuarastalan$121,100–$131,118
Ceudail 10mh–90mh$116,421–$144,019

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$112,923
FY20241$116,421
FY20255$124,363
FY20264$126,100

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$126,100–$227,000
Ìre IV
St. Petersburg, FL2 Gibl 202623 Sult 2026Dearbhaichte
$144,019–$227,000
Ìre IV
Arden, NC23 Faoi 202626 Ògmh 2026Dearbhaichte
$126,100–$227,000
Ìre IV
St. Petersburg, FL22 Faoi 202616 Cèit 2026Dearbhaichte
$121,200–$218,200
Ìre IV
St. Petersburg, FL20 Faoi 20261 Ògmh 2026Dearbhaichte
$121,000–$218,200
Ìre IV
St. Petersburg, FL14 Lùna 202515 Samh 2025Dearbhaichte
$136,136–$172,201
Ìre IV
St. Petersburg, FL13 Cèit 202528 Sult 2025Dearbhaichte
$124,363–$172,201
Ìre IV
St. Petersburg, FL28 Gibl 202528 Gibl 2025Dearbhaichte
$151,923–$240,000
Ìre IV
Clinton, MA21 Gibl 20252 Dàmh 2025Dearbhaichte
$122,429–$166,377
Ìre IV
St. Petersburg, FL6 Samh 20247 Gearr 2025Dearbhaichte
$116,421–$209,557
Ìre IV
St. Petersburg, FL4 Dàmh 202316 Dàmh 2023Dearbhaichte
$112,923–$186,034
Ìre IV
St. Petersburg, FL30 Faoi 20231 Ògmh 2023Dearbhaichte

Obraichean eile aig Jabil Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).