Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Jacobs Engineering Group Inc. › Assistant Project Manager

Assistant Project Manager aig Jacobs Engineering Group Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Assistant Project Manager aig Jacobs Engineering Group Inc.. Tuarastal bunasach meadhanach $90,000; leth meadhanach $90,000–$90,000.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$90,000
Leath mheadhanach nan tuarastalan$90,000–$90,000
Ceudail 10mh–90mh$84,000–$92,270

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20243$90,000
FY20251$90,000
FY20261$93,784

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$93,784
Ìre II
West Memphis, AR6 Cèit 202613 Cèit 2026Dearbhaichte
$90,000
Ìre I
Dallas, TX9 Cèit 202516 Cèit 2025Dearbhaichte
$90,000
Ìre I
Missouri City, TX20 Sult 20241 Dàmh 2024Dearbhaichte
$90,000
Ìre I
Missouri City, TX17 Sult 20242 Dàmh 2024Dearbhaichte
$80,000
Ìre I
Jacksonville, FL4 Màrt 20227 Màrt 2022Dearbhaichte, an uair sin air a tharraing air ais

Assistant Project Manager aig gach neach-fastaidh →

Obraichean eile aig Jacobs Engineering Group Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).