Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Jacobs Engineering Group Inc. › Construction Management Professional

Construction Management Professional aig Jacobs Engineering Group Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Construction Management Professional aig Jacobs Engineering Group Inc.. Tuarastal bunasach meadhanach $92,000; leth meadhanach $91,899–$126,919.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$92,000
Leath mheadhanach nan tuarastalan$91,899–$126,919
Ceudail 10mh–90mh$87,760–$131,108

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20251$85,000
FY20264$109,460

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$126,919
Ìre II
Wilmington, DE21 Gibl 20261 Dàmh 2026Dearbhaichte
$91,899
Ìre II
Houston, TX14 Gibl 20261 Dàmh 2026Dearbhaichte
$133,900
Ìre III
Atlanta, GA27 Gearr 202629 Lùna 2026Dearbhaichte
$92,000
Ìre I
Wilson, NC3 Samh 202510 Samh 2025Dearbhaichte
$85,000
Ìre I
Cary, NC6 Cèit 20251 Dàmh 2025Dearbhaichte

Obraichean eile aig Jacobs Engineering Group Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).