Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Jacobs Engineering Group Inc. › Electrical Engineering Professional

Electrical Engineering Professional aig Jacobs Engineering Group Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Electrical Engineering Professional aig Jacobs Engineering Group Inc.. Tuarastal bunasach meadhanach $128,000; leth meadhanach $90,626–$130,000.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$128,000
Leath mheadhanach nan tuarastalan$90,626–$130,000
Ceudail 10mh–90mh$83,050–$145,600

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20252$84,313
FY20263$130,000

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$128,000
Ìre II
Moon Township, PA30 Gibl 20261 Dàmh 2026Dearbhaichte
$156,000
Ìre IV
Niles, IL24 Gibl 20261 Dàmh 2026Dearbhaichte
$130,000
Ìre II
Moon Township, PA23 Gibl 20261 Dàmh 2026Dearbhaichte
$90,626
Ìre I
Boston, MA19 Cèit 20251 Dàmh 2025Dearbhaichte
$78,000
Ìre I
Chicago, IL5 Cèit 20251 Dàmh 2025Dearbhaichte

Obraichean eile aig Jacobs Engineering Group Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).