Dachaigh › Luchd-obrach › Johnson, Mirmiran & Thompson, Inc.
Johnson, Mirmiran & Thompson, Inc.: Tuarastalan H-1B agus taic bhìosa
Chuir Johnson, Mirmiran & Thompson, Inc. 20 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 20. Tuarastal meadhanach a chaidh a thabhann: $84,234.
A bheil Johnson, Mirmiran & Thompson, Inc. a’ toirt taic do bhìosaichean H-1B?
Chuir Johnson, Mirmiran & Thompson, Inc. 20 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 12 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Facilities - CM Project Engineer | 3 | $80,000 |
| Water Resources Design Engineer | 3 | $81,120 |
| Structures Design Engineer | 2 | $80,000 |
| Traffic Design Engineer | 2 | $82,560 |
| Construction Scheduler | 1 | $90,000 |
| Bridge Project Engineer | 1 | $103,000 |
| Building/Facility Structural Engineer | 1 | $118,000 |
| Highways Design Engineer | 1 | $90,000 |
| Geotechnical Design Engineer | 1 | $85,000 |
| Water/Wastewater Hydraulic Modeling Project Manager | 1 | $125,778 |
| Marketing Research Analyst | 1 | $80,000 |
| Market Research Analyst | 1 | $80,000 |
| Water Resources Project Engineer | 1 | $115,000 |
| Project Manager | 1 | $111,426 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 1 | $70,000 |
| FY2024 | 1 | $90,000 |
| FY2025 | 10 | $84,500 |
| FY2026 | 8 | $82,794 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
- Herndon, VA4
- San Antonio, TX3
- Austin, TX2
- Newark, DE2
- Charlotte, NC2
- Washington, DC1
- Tyler, TX1
- El Paso, TX1
- Raleigh, NC1
- Hunt Valley, MD1
- Richmond, VA1
- McKinney, TX1
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Water Resources Design Engineer | $84,469–$91,520 Ìre II | McKinney, TX | 12 Cèit 2026 | 15 Ògmh 2026 | Dearbhaichte |
| Project Manager | $111,426–$180,544 Ìre IV | San Antonio, TX | 4 Cèit 2026 | 30 Sult 2026 | Dearbhaichte |
| Water Resources Project Engineer | $115,000–$130,000 Ìre III | Herndon, VA | 1 Cèit 2026 | 6 Iuch 2026 | Dearbhaichte |
| Market Research Analyst | $80,000–$90,000 Ìre I | Charlotte, NC | 23 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Traffic Design Engineer | $81,120–$102,336 Ìre I | Newark, DE | 9 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Marketing Research Analyst | $80,000–$90,000 Ìre I | Charlotte, NC | 9 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Water Resources Design Engineer | $81,120–$103,168 Ìre I | Richmond, VA | 9 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Water/Wastewater Hydraulic Modeling Project Manager | $125,778–$145,600 Ìre IV | Herndon, VA | 4 Màrt 2026 | 20 Gibl 2026 | Dearbhaichte |
| Facilities - CM Project Engineer | $95,000–$105,000 Ìre II | Austin, TX | 2 Iuch 2025 | 1 Faoi 2026 | Dearbhaichte |
| Water Resources Design Engineer | $80,000–$90,000 Ìre II | Tyler, TX | 5 Ògmh 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Facilities - CM Project Engineer | $80,000–$105,000 Ìre II | El Paso, TX | 29 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Traffic Design Engineer | $84,000–$90,000 Ìre II | Raleigh, NC | 25 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Highways Design Engineer | $90,000–$105,000 Ìre II | Herndon, VA | 25 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Structures Design Engineer | $80,000–$95,000 Ìre II | San Antonio, TX | 25 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Geotechnical Design Engineer | $85,000–$1,050,000 Ìre II | Hunt Valley, MD | 25 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Structures Design Engineer | $80,000–$95,000 Ìre II | San Antonio, TX | 25 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Bridge Project Engineer | $103,000–$123,000 Ìre III | Herndon, VA | 21 Gearr 2025 | 3 Màrt 2025 | Dearbhaichte |
| Building/Facility Structural Engineer | $118,000–$138,000 Ìre IV | Washington, DC | 30 Faoi 2025 | 10 Gearr 2025 | Dearbhaichte |
| Construction Scheduler | $90,000–$110,000 Ìre II | Newark, DE | 22 Gibl 2024 | 1 Sult 2024 | Dearbhaichte |
| Facilities - CM Project Engineer | $70,000–$80,000 Ìre I | Austin, TX | 3 Faoi 2023 | 3 Faoi 2023 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).