Dachaigh › Luchd-obrach › Judlau Contracting, Inc.
Judlau Contracting, Inc.: Tuarastalan H-1B agus taic bhìosa
Chuir Judlau Contracting, Inc. 27 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 27. Tuarastal meadhanach a chaidh a thabhann: $99,382.
A bheil Judlau Contracting, Inc. a’ toirt taic do bhìosaichean H-1B?
Chuir Judlau Contracting, Inc. 27 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 14 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Iarrtasan cairt uaine (PERM) aig Judlau Contracting, Inc.: 4 →
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Project Engineer | 14 | $99,226 |
| Field Engineer | 6 | $99,299 |
| Assistant Project Manager | 3 | $130,069 |
| Superintendent | 1 | $160,000 |
| Estimator | 1 | $75,000 |
| Estimator II | 1 | $94,760 |
| Estimator I | 1 | $75,000 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 1 | $160,000 |
| FY2024 | 11 | $95,534 |
| FY2025 | 11 | $101,878 |
| FY2026 | 4 | $121,933 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
- Brooklyn, NY8
- New York, NY5
- Elmhurst, IL3
- Jackson Heights, NY2
- College Point, NY2
- Bronx, NY2
- Worcester, MA1
- Oak Brook, IL1
- East Elmhurst, NY1
- Roxbury, MA1
- Rolling Meadows, IL1
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Assistant Project Manager | $144,247–$160,000 | Brooklyn, NY | 14 Cèit 2026 | 28 Cèit 2026 | Dearbhaichte |
| Project Engineer | $119,496–$135,000 Ìre II | Brooklyn, NY | 7 Gibl 2026 | 20 Sult 2026 | Dearbhaichte |
| Assistant Project Manager | $124,370 | Rolling Meadows, IL | 23 Gearr 2026 | 21 Lùna 2026 | Dearbhaichte |
| Project Engineer | $99,382–$115,000 Ìre III | New York, NY | 23 Faoi 2026 | 15 Ògmh 2026 | Dearbhaichte |
| Project Engineer | $135,000–$150,000 Ìre II | Brooklyn, NY | 28 Cèit 2025 | 22 Lùna 2025 | Dearbhaichte |
| Project Engineer | $126,672 Ìre II | Roxbury, MA | 16 Cèit 2025 | 30 Cèit 2025 | Dearbhaichte |
| Project Engineer | $96,138 Ìre II | New York, NY | 20 Màrt 2025 | 15 Ògmh 2025 | Dearbhaichte |
| Project Engineer | $131,518 Ìre II | Bronx, NY | 3 Màrt 2025 | 2 Sult 2025 | Dearbhaichte |
| Project Engineer | $160,000 Ìre II | Bronx, NY | 26 Gearr 2025 | 25 Lùna 2025 | Dearbhaichte |
| Field Engineer | $101,878 Ìre I | Jackson Heights, NY | 21 Gearr 2025 | 21 Lùna 2025 | Dearbhaichte |
| Project Engineer | $99,070 Ìre II | Oak Brook, IL | 21 Gearr 2025 | 21 Lùna 2025 | Dearbhaichte |
| Estimator I | $75,000–$85,000 Ìre I | East Elmhurst, NY | 11 Gearr 2025 | 11 Lùna 2025 | Dearbhaichte |
| Assistant Project Manager | $130,069–$150,000 | New York, NY | 6 Gearr 2025 | 14 Gearr 2025 | Dearbhaichte |
| Project Engineer | $96,138 Ìre II | New York, NY | 17 Faoi 2025 | 13 Gearr 2025 | Dearbhaichte |
| Field Engineer | $101,878 Ìre I | Brooklyn, NY | 25 Sult 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Field Engineer | $101,878 Ìre I | Brooklyn, NY | 17 Sult 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Project Engineer | $86,133–$90,004 Ìre II | Brooklyn, NY | 27 Ògmh 2024 | 16 Sult 2024 | Dearbhaichte |
| Project Engineer | $86,133–$90,004 Ìre II | Brooklyn, NY | 3 Ògmh 2024 | 16 Sult 2024 | Dearbhaichte |
| Project Engineer | $104,000–$115,000 Ìre I | New York, NY | 18 Gibl 2024 | 26 Gibl 2024 | Dearbhaichte |
| Estimator II | $94,760–$150,000 Ìre III | College Point, NY | 12 Gibl 2024 | 24 Gibl 2024 | Dearbhaichte |
| Field Engineer | $74,672–$90,000 Ìre I | Elmhurst, IL | 7 Màrt 2024 | 6 Sult 2024 | Dearbhaichte |
| Project Engineer | $95,534 Ìre II | Elmhurst, IL | 7 Màrt 2024 | 6 Sult 2024 | Dearbhaichte |
| Project Engineer | $95,534 Ìre II | Elmhurst, IL | 7 Màrt 2024 | 6 Sult 2024 | Dearbhaichte |
| Field Engineer | $96,720 Ìre I | Jackson Heights, NY | 7 Màrt 2024 | 6 Sult 2024 | Dearbhaichte |
| Field Engineer | $96,720 Ìre I | Brooklyn, NY | 7 Màrt 2024 | 6 Sult 2024 | Dearbhaichte |
| Estimator | $75,000–$90,000 Ìre II | College Point, NY | 5 Màrt 2024 | 4 Sult 2024 | Dearbhaichte |
| Superintendent | $160,000 Ìre IV | Worcester, MA | 26 Sult 2022 | 6 Gearr 2023 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).