Dachaigh › Luchd-obrach › Juniper Networks, Inc. › QA Engineer
QA Engineer aig Juniper Networks, Inc.: Tuarastalan H-1B
6 iarrtasan cumhaichean-obrach airson an dreuchd QA Engineer aig Juniper Networks, Inc.. Tuarastal bunasach meadhanach $137,270; leth meadhanach $133,432–$141,107.
Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$137,270
Leath mheadhanach nan tuarastalan$133,432–$141,107
Ceudail 10mh–90mh$131,789–$149,906
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 1 | $130,146 |
| FY2024 | 1 | $141,107 |
| FY2025 | 4 | $137,270 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $158,704–$160,500 Ìre IV | Duvall, WA | 16 Sult 2025 | 13 Màrt 2026 | Dearbhaichte |
| $133,432–$164,154 Ìre II | Cupertino, CA | 3 Ògmh 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $133,432–$164,154 Ìre II | Cupertino, CA | 2 Faoi 2025 | 1 Ògmh 2025 | Dearbhaichte |
| $141,107–$183,726 Ìre II | Cupertino, CA | 5 Dàmh 2023 | 5 Gibl 2024 | Dearbhaichte |
| $141,107–$183,726 Ìre II | Cupertino, CA | 20 Sult 2023 | 16 Dàmh 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| $130,146–$165,000 Ìre IV | Redmond, WA | 3 Màrt 2023 | 13 Màrt 2023 | Dearbhaichte |
QA Engineer aig gach neach-fastaidh →
Obraichean eile aig Juniper Networks, Inc.
- Software Engineer$135,283
- Software Engineer Staff$169,240
- Software Engineer Senior Staff$192,941
- Software Engineer Sr Staff$192,941
- ASIC Engineer$130,790
- Product Manager$125,330
- Hardware Engineer$130,894
- Product Manager Staff$185,723
- ASIC Engineer Staff$184,464
- Principal Engineer, SW$209,550
- Security Engineer$131,217
- Supply Chain Specialist$85,592
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).