Dachaigh › Luchd-obrach › Kelith Group Inc › CQV Engineer
CQV Engineer aig Kelith Group Inc: Tuarastalan H-1B
9 iarrtasan cumhaichean-obrach airson an dreuchd CQV Engineer aig Kelith Group Inc. Tuarastal bunasach meadhanach $89,835; leth meadhanach $88,093–$91,978.
Iarrtasan (LCAs)9
Tuarastal meadhanach a chaidh a thabhann$89,835
Leath mheadhanach nan tuarastalan$88,093–$91,978
Ceudail 10mh–90mh$83,672–$99,684
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2024 | 2 | $87,173 |
| FY2025 | 1 | $88,462 |
| FY2026 | 5 | $89,835 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $89,835 Ìre II | Holly Springs, NC | 2 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $89,835 Ìre II | Holly Springs, NC | 28 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $86,986 Ìre II | Greenville, NC | 4 Cèit 2026 | 11 Cèit 2026 | Dearbhaichte |
| $102,669 Ìre II | Portsmouth, NH | 8 Gibl 2026 | 20 Gibl 2026 | Dearbhaichte |
| $89,835 Ìre II | Holly Springs, NC | 31 Dùbh 2025 | 5 Faoi 2026 | Dearbhaichte |
| $88,462–$88,463 Ìre II | Holly Springs, NC | 30 Sult 2024 | 7 Dàmh 2024 | Dearbhaichte |
| — Ìre II | Holly Springs, NC | 30 Sult 2024 | 7 Dàmh 2024 | Dearbhaichte |
| $98,405–$98,406 Ìre II | Marlborough, MA | 2 Lùna 2024 | 12 Lùna 2024 | Dearbhaichte |
| $75,941–$75,942 Ìre II | Verona, WI | 24 Ògmh 2024 | 1 Dàmh 2024 | Dearbhaichte |
CQV Engineer aig gach neach-fastaidh →
Obraichean eile aig Kelith Group Inc
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).