Dachaigh › Luchd-obrach › Kiewit Infrastructure South Co.
Kiewit Infrastructure South Co.: Tuarastalan H-1B agus taic bhìosa
Chuir Kiewit Infrastructure South Co. 17 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 17. Tuarastal meadhanach a chaidh a thabhann: $89,180.
A bheil Kiewit Infrastructure South Co. a’ toirt taic do bhìosaichean H-1B?
Chuir Kiewit Infrastructure South Co. 17 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 27 Gibl 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Field/Office Engineer | 4 | $81,640 |
| Field Engineer | 4 | $92,550 |
| Project Engineer | 2 | $105,690 |
| Engineer II | 1 | $91,260 |
| Business Manager | 1 | $87,361 |
| Scheduler | 1 | $90,770 |
| Project Manager | 1 | $174,688 |
| Field Engineer 3 | 1 | $95,160 |
| Quality Control (QC) Engineer | 1 | $87,583 |
| Estimator | 1 | $88,251 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 4 | $84,500 |
| FY2024 | 5 | $90,770 |
| FY2025 | 3 | $95,160 |
| FY2026 | 5 | $88,251 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
- Westlake, TX2
- Peachtree, GA2
- Ellicott City, MD2
- Fort Worth, TX1
- Hanover, MD1
- Mobile, AL1
- Pineville, SC1
- Taylor, TX1
- Lone Tree, CO1
- Sunrise, FL1
- Peachtree City, GA1
- Damascus, VA1
- Orlando, FL1
- Gail, TX1
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Project Engineer | $107,366 Ìre IV | Gail, TX | 27 Gibl 2026 | 28 Gibl 2026 | Dearbhaichte |
| Estimator | $88,251 Ìre I | Orlando, FL | 21 Gearr 2026 | 11 Lùna 2026 | Dearbhaichte |
| Field Engineer | $86,580 Ìre I | Ellicott City, MD | 16 Gearr 2026 | 13 Lùna 2026 | Dearbhaichte |
| Field Engineer | $97,340 Ìre I | Peachtree City, GA | 7 Faoi 2026 | 19 Faoi 2026 | Dearbhaichte |
| Quality Control (QC) Engineer | $87,583 Ìre I | Damascus, VA | 7 Faoi 2026 | 12 Faoi 2026 | Dearbhaichte |
| Field Engineer 3 | $95,160 | Sunrise, FL | 4 Sult 2025 | 29 Sult 2025 | Dearbhaichte |
| Field Engineer | $89,180 Ìre I | Ellicott City, MD | 23 Dùbh 2024 | 13 Faoi 2025 | Dearbhaichte |
| Project Manager | $174,688 Ìre IV | Westlake, TX | 18 Samh 2024 | 17 Cèit 2025 | Dearbhaichte |
| Field/Office Engineer | $86,612 Ìre I | Peachtree, GA | 19 Lùna 2024 | 19 Lùna 2024 | Dearbhaichte |
| Project Engineer | $104,013 Ìre IV | Pineville, SC | 31 Cèit 2024 | 10 Ògmh 2024 | Dearbhaichte |
| Field Engineer | $95,921 Ìre I | Taylor, TX | 16 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Scheduler | $90,770 Ìre II | Lone Tree, CO | 7 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Field/Office Engineer | $81,640 Ìre I | Peachtree, GA | 16 Samh 2023 | 4 Dùbh 2023 | Dearbhaichte |
| Field/Office Engineer | $81,640 Ìre I | Hanover, MD | 24 Iuch 2023 | 7 Lùna 2023 | Dearbhaichte |
| Field/Office Engineer | $81,640 Ìre I | Mobile, AL | 6 Iuch 2023 | 17 Iuch 2023 | Dearbhaichte |
| Engineer II | $91,260 | Westlake, TX | 16 Cèit 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Business Manager | $87,361 Ìre II | Fort Worth, TX | 17 Gibl 2023 | 1 Sult 2023 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).