Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Kpmg LLP › Lead Engineer II

Lead Engineer II aig Kpmg LLP: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Lead Engineer II aig Kpmg LLP. Tuarastal bunasach meadhanach $168,400; leth meadhanach $155,500–$199,400.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$168,400
Leath mheadhanach nan tuarastalan$155,500–$199,400
Ceudail 10mh–90mh$152,440–$219,560

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20242$161,950
FY20251$150,400
FY20262$216,200

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$199,400–$227,800
Ìre IV
Montvale, NJ23 Ògmh 20265 Samh 2026Dearbhaichte
$233,000
Ìre IV
New York, NY10 Ògmh 20269 Dùbh 2026Dearbhaichte
$150,400
Ìre IV
Grand Rapids, MI11 Dàmh 202410 Gibl 2025Dearbhaichte
$168,400
Ìre III
McLean, VA24 Iuch 20243 Faoi 2025Dearbhaichte
$155,500
Ìre III
Dallas, TX14 Dùbh 20237 Ògmh 2024Dearbhaichte

Obraichean eile aig Kpmg LLP

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).