Dachaigh › Luchd-obrach › Kyyba, Inc. › HIL Validation Engineer
HIL Validation Engineer aig Kyyba, Inc.: Tuarastalan H-1B
5 iarrtasan cumhaichean-obrach airson an dreuchd HIL Validation Engineer aig Kyyba, Inc.. Tuarastal bunasach meadhanach $127,400; leth meadhanach $123,760–$127,400.
Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$127,400
Leath mheadhanach nan tuarastalan$123,760–$127,400
Ceudail 10mh–90mh$113,776–$128,960
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2024 | 3 | $127,400 |
| FY2025 | 2 | $118,560 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $130,000 Ìre II | Troy, MI | 12 Lùna 2025 | 14 Dùbh 2025 | Dearbhaichte |
| $107,120 Ìre II | Auburn Hills, MI | 6 Faoi 2025 | 13 Faoi 2025 | Dearbhaichte |
| $127,400 Ìre III | Troy, MI | 14 Ògmh 2024 | 14 Dùbh 2024 | Dearbhaichte |
| $127,400 Ìre III | Troy, MI | 19 Dùbh 2023 | 26 Faoi 2024 | Dearbhaichte |
| $123,760 Ìre III | Troy, MI | 7 Samh 2023 | 20 Samh 2023 | Dearbhaichte |
HIL Validation Engineer aig gach neach-fastaidh →
Obraichean eile aig Kyyba, Inc.
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).