Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Lam Research Corporation › Manager, Engineering

Manager, Engineering aig Lam Research Corporation: Tuarastalan H-1B

11 iarrtasan cumhaichean-obrach airson an dreuchd Manager, Engineering aig Lam Research Corporation. Tuarastal bunasach meadhanach $157,643; leth meadhanach $141,300–$180,232.

Iarrtasan (LCAs)11
Tuarastal meadhanach a chaidh a thabhann$157,643
Leath mheadhanach nan tuarastalan$141,300–$180,232
Ceudail 10mh–90mh$132,288–$182,645

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$169,822
FY20244$170,466
FY20252$146,838
FY20262$146,172

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$136,427–$231,000
Ìre IV
Tualatin, OR8 Ògmh 202628 Dàmh 2026Dearbhaichte
$155,917–$231,000
Ìre II
Tualatin, OR7 Gibl 202613 Gibl 2026Dearbhaichte
$172,994–$259,000
Ìre I
Fremont, CA16 Gibl 202528 Gibl 2025Dearbhaichte
$172,994–$259,000
Ìre I
Fremont, CA11 Gibl 202528 Gibl 2025Air a tharraing air ais
$120,682–$222,000
Ìre I
Tualatin, OR24 Gearr 20253 Màrt 2025Dearbhaichte
$182,645–$259,000
Ìre II
Fremont, CA15 Cèit 202427 Cèit 2024Dearbhaichte
$182,645–$259,000
Ìre II
Fremont, CA24 Gibl 20241 Dàmh 2024Dearbhaichte
$133,578–$221,000
Ìre II
Tualatin, OR22 Màrt 202425 Màrt 2024Dearbhaichte
$158,288–$211,000
Ìre III
Tualatin, OR14 Dùbh 202327 Dùbh 2023Dearbhaichte
$182,645–$244,000
Ìre II
Fremont, CA25 Lùna 20231 Sult 2023Dearbhaichte
$156,998–$236,200
Ìre I
Fremont, CA16 Dùbh 202219 Dùbh 2022Dearbhaichte

Manager, Engineering aig gach neach-fastaidh →

Obraichean eile aig Lam Research Corporation

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).