Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › LG Energy Solution Michigan, Inc. › Production Engineer

Production Engineer aig LG Energy Solution Michigan, Inc.: Tuarastalan H-1B

8 iarrtasan cumhaichean-obrach airson an dreuchd Production Engineer aig LG Energy Solution Michigan, Inc.. Tuarastal bunasach meadhanach $85,302; leth meadhanach $76,855–$85,604.

Iarrtasan (LCAs)8
Tuarastal meadhanach a chaidh a thabhann$85,302
Leath mheadhanach nan tuarastalan$76,855–$85,604
Ceudail 10mh–90mh$67,554–$92,881

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20235$85,604
FY20242$82,526
FY20251$64,002

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$64,002
Ìre I
Holland, MI13 Cèit 202527 Cèit 2025Dearbhaichte
$79,448
Ìre I
Holland, MI6 Cèit 20241 Dàmh 2024Dearbhaichte
$85,604
Ìre I
Holland, MI16 Dàmh 20231 Faoi 2024Dearbhaichte
$85,604
Ìre I
Holland, MI7 Sult 20231 Faoi 2024Dearbhaichte
$69,076
Ìre I
Holland, MI17 Lùna 20232 Dàmh 2023Dearbhaichte
$85,604
Ìre I
Holland, MI17 Lùna 20232 Dàmh 2023Dearbhaichte
$109,860
Ìre I
Holland, MI28 Gibl 20231 Dàmh 2023Dearbhaichte
$85,000
Ìre II
Hazel Park, MI16 Dùbh 202227 Dùbh 2022Dearbhaichte

Production Engineer aig gach neach-fastaidh →

Obraichean eile aig LG Energy Solution Michigan, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).