Dachaigh › Luchd-obrach › Lithko Contracting, LLC
Lithko Contracting, LLC: Tuarastalan H-1B agus taic bhìosa
Chuir Lithko Contracting, LLC 20 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 19. Tuarastal meadhanach a chaidh a thabhann: $87,755.
A bheil Lithko Contracting, LLC a’ toirt taic do bhìosaichean H-1B?
Chuir Lithko Contracting, LLC 20 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 5 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Iarrtasan cairt uaine (PERM) aig Lithko Contracting, LLC: 3 →
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Project Coordinator | 6 | $90,250 |
| Civil Engineer (Project Coordinator) | 4 | $85,800 |
| Field Engineer | 3 | $83,000 |
| Estimator | 2 | $75,300 |
| Preconstruction Coordinator | 2 | $77,168 |
| AI Engineer | 2 | $96,000 |
| Area Lead | 1 | $250,000 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 3 | $77,563 |
| FY2024 | 3 | $110,180 |
| FY2025 | 10 | $83,000 |
| FY2026 | 4 | $88,200 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
- Buford, GA5
- Upper Marlboro, MD3
- Concord, NC2
- Plain City, OH2
- West Chester, OH2
- LaVergne, TN2
- Bowie, MD1
- Rogers, AR1
- Liberty Township, OH1
- Richmond, VA1
Dreuchdan
- Civil Engineers11
- Cost Estimators3
- Construction Managers3
- Software Developers2
- Architectural and Engineering Managers1
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Preconstruction Coordinator | $89,336 Ìre II | Plain City, OH | 5 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Field Engineer | $88,400 Ìre II | LaVergne, TN | 5 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Civil Engineer (Project Coordinator) | $87,755 Ìre II | Buford, GA | 16 Gearr 2026 | 6 Màrt 2026 | Dearbhaichte |
| Project Coordinator | $88,000–$980,000 Ìre IV | Richmond, VA | 9 Gearr 2026 | 23 Gearr 2026 | Dearbhaichte |
| AI Engineer | $96,000–$115,000 Ìre II | West Chester, OH | 2 Cèit 2025 | 2 Sult 2025 | Dearbhaichte |
| Field Engineer | $83,000–$93,000 Ìre II | Rogers, AR | 4 Màrt 2025 | 2 Sult 2025 | Dearbhaichte |
| Project Coordinator | $71,000–$81,000 Ìre I | Buford, GA | 4 Màrt 2025 | 2 Sult 2025 | Dearbhaichte |
| Field Engineer | $83,000–$93,000 Ìre II | LaVergne, TN | 4 Màrt 2025 | 2 Sult 2025 | Dearbhaichte |
| Preconstruction Coordinator | $65,000–$85,000 Ìre I | Plain City, OH | 4 Màrt 2025 | 2 Sult 2025 | Dearbhaichte |
| AI Engineer | $96,000–$115,000 Ìre II | West Chester, OH | 4 Màrt 2025 | 2 Sult 2025 | Dearbhaichte |
| Project Coordinator | $92,500–$104,500 Ìre III | Liberty Township, OH | 6 Gearr 2025 | 10 Gearr 2025 | Dearbhaichte |
| Estimator | $70,000–$81,000 Ìre III | Concord, NC | 2 Faoi 2025 | 6 Ògmh 2025 | Dearbhaichte |
| Estimator | $80,600 Ìre III | Concord, NC | 20 Dùbh 2024 | 6 Ògmh 2025 | Dearbhaichte |
| Project Coordinator | $103,000–$113,000 Ìre III | Bowie, MD | 31 Dàmh 2024 | 8 Samh 2024 | Dearbhaichte |
| Area Lead | $250,000 Ìre IV | Upper Marlboro, MD | 11 Iuch 2024 | 1 Lùna 2024 | Dearbhaichte |
| Project Coordinator | $110,180 Ìre III | Upper Marlboro, MD | 29 Gibl 2024 | 18 Dàmh 2024 | Dearbhaichte |
| Project Coordinator | $84,219–$91,000 Ìre II | Upper Marlboro, MD | 23 Faoi 2024 | 14 Màrt 2024 | Dearbhaichte |
| Civil Engineer (Project Coordinator) | $85,800 Ìre III | Buford, GA | 7 Màrt 2023 | 14 Màrt 2023 | Dearbhaichte |
| Civil Engineer (Project Coordinator) | $69,326 Ìre II | Buford, GA | 28 Gearr 2023 | 6 Màrt 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| Civil Engineer (Project Coordinator) | $69,326 Ìre II | Buford, GA | 27 Gearr 2023 | 6 Màrt 2023 | Air a tharraing air ais |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).