Dachaigh › Luchd-obrach › Lowe's Companies, Inc. › Senior Infrastructure Engineer
Senior Infrastructure Engineer aig Lowe's Companies, Inc.: Tuarastalan H-1B
23 iarrtasan cumhaichean-obrach airson an dreuchd Senior Infrastructure Engineer aig Lowe's Companies, Inc.. Tuarastal bunasach meadhanach $104,520; leth meadhanach $103,210–$104,520.
Iarrtasan (LCAs)23
Tuarastal meadhanach a chaidh a thabhann$104,520
Leath mheadhanach nan tuarastalan$103,210–$104,520
Ceudail 10mh–90mh$95,326–$129,977
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 7 | $95,326 |
| FY2024 | 9 | $104,520 |
| FY2025 | 7 | $103,210 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $103,210–$161,524 Ìre III | Charlotte, NC | 4 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $103,210–$127,989 Ìre III | Charlotte, NC | 19 Dùbh 2024 | 13 Ògmh 2025 | Dearbhaichte |
| $103,210–$142,174 Ìre III | Charlotte, NC | 21 Samh 2024 | 17 Cèit 2025 | Dearbhaichte |
| $103,210–$152,571 Ìre III | Charlotte, NC | 21 Samh 2024 | 20 Cèit 2025 | Dearbhaichte |
| $103,210–$127,926 Ìre III | Charlotte, NC | 31 Dàmh 2024 | 2 Cèit 2025 | Dearbhaichte |
| $109,886–$143,222 Ìre III | Charlotte, NC | 20 Sult 2024 | 21 Màrt 2025 | Dearbhaichte |
| $104,520–$130,365 Ìre III | Charlotte, NC | 6 Cèit 2024 | 5 Samh 2024 | Dearbhaichte |
| $104,520–$139,509 Ìre III | Charlotte, NC | 26 Gibl 2024 | 18 Dàmh 2024 | Dearbhaichte |
| $104,520–$156,549 Ìre III | Charlotte, NC | 1 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $104,520–$140,595 Ìre III | Mooresville, NC | 29 Gearr 2024 | 16 Lùna 2024 | Dearbhaichte |
| $104,520–$137,348 Ìre III | Charlotte, NC | 31 Dàmh 2023 | 30 Gibl 2024 | Dearbhaichte |
| $104,520–$123,600 Ìre III | Charlotte, NC | 16 Dàmh 2023 | 1 Gibl 2024 | Dearbhaichte |
| $104,520–$142,064 Ìre III | Charlotte, NC | 6 Sult 2023 | 5 Màrt 2024 | Dearbhaichte |
| $104,520–$134,947 Ìre III | Charlotte, NC | 7 Iuch 2023 | 6 Faoi 2024 | Dearbhaichte, an uair sin air a tharraing air ais |
| $95,326–$123,654 Ìre III | Charlotte, NC | 5 Ògmh 2023 | 2 Dùbh 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| $95,326–$147,816 Ìre III | Charlotte, NC | 28 Dùbh 2022 | 2 Ògmh 2023 | Dearbhaichte |
| $95,326–$152,978 Ìre III | Charlotte, NC | 13 Dùbh 2022 | 1 Ògmh 2023 | Dearbhaichte |
| $95,326–$132,613 Ìre III | Mooresville, NC | 18 Samh 2022 | 23 Faoi 2023 | Dearbhaichte |
| $103,854–$137,500 Ìre III | Charlotte, NC | 27 Dàmh 2022 | 4 Samh 2022 | Dearbhaichte |
| $95,326–$125,000 Ìre III | Charlotte, NC | 10 Dàmh 2022 | 10 Dàmh 2022 | Dearbhaichte |
| $137,500 Ìre III | Mooresville, NC | 1 Lùna 2022 | 20 Faoi 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| $165,542 Ìre III | Mooresville, NC | 8 Gearr 2022 | 8 Lùna 2022 | Dearbhaichte, an uair sin air a tharraing air ais |
| $135,000 Ìre III | Mooresville, NC | 22 Samh 2021 | 6 Dùbh 2021 | Dearbhaichte, an uair sin air a tharraing air ais |
Senior Infrastructure Engineer aig gach neach-fastaidh →
Obraichean eile aig Lowe's Companies, Inc.
- Senior Software Engineer$128,232
- Software Engineer$106,974
- Lead Software Engineer$133,536
- Senior Manager, Software Engineering$154,669
- Senior Data Engineer$128,606
- Data Engineer$105,747
- Director, Software Engineering$149,469
- Senior Data Scientist$129,854
- Senior Engineer, Information Security$104,520
- Lead Data Engineer$130,021
- Lead Product Manager$127,774
- Senior Product Manager$116,563
- Senior Analyst, DACI Analytics$107,016
- Senior Director, Technology$128,461
- Lead Engineer, Information Security$104,520
- Data Scientist$105,747
- Principal Software Engineer$152,069
- Lead Data Scientist$129,938
- Senior Manager, Data Engineering$153,962
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).