Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › LTIMindtree Limited › Associate Principal - Quality Engineering

Associate Principal - Quality Engineering aig LTIMindtree Limited: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Associate Principal - Quality Engineering aig LTIMindtree Limited. Tuarastal bunasach meadhanach $134,320; leth meadhanach $133,400–$139,142.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$134,320
Leath mheadhanach nan tuarastalan$133,400–$139,142
Ceudail 10mh–90mh$126,500–$150,721

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$130,021
FY20241$133,400
FY20263$135,240

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$133,400
Ìre II
Cary, NC20 Cèit 202623 Cèit 2026Dearbhaichte
$161,000
Ìre III
Charlotte, NC2 Gibl 20268 Gibl 2026Dearbhaichte
$135,240
Ìre II
Allston, MA13 Samh 202519 Samh 2025Dearbhaichte
$133,400
Ìre II
Orlando, FL7 Màrt 20248 Màrt 2024Dearbhaichte
$119,600
Ìre II
Richardson, TX24 Faoi 202330 Faoi 2023Dearbhaichte
$140,442–$151,000
Ìre III
San Jose, CA19 Dùbh 202219 Dùbh 2022Dearbhaichte

Obraichean eile aig LTIMindtree Limited

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).