Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Lucid USA, Inc. › Sr. Engineer, Body Controls

Sr. Engineer, Body Controls aig Lucid USA, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Sr. Engineer, Body Controls aig Lucid USA, Inc.. Tuarastal bunasach meadhanach $150,654; leth meadhanach $145,732–$159,224.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$150,654
Leath mheadhanach nan tuarastalan$145,732–$159,224
Ceudail 10mh–90mh$119,270–$159,736

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20243$159,224
FY20262$126,142

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$101,629–$189,600
Ìre I
Newark, CA15 Gibl 20261 Dàmh 2026Dearbhaichte
$150,654–$179,780
Ìre III
Newark, CA7 Gibl 20261 Dàmh 2026Dearbhaichte
$159,224–$179,224
Ìre III
Newark, CA11 Màrt 202430 Lùna 2024Dearbhaichte
$145,732–$165,732Newark, CA28 Gearr 202416 Lùna 2024Dearbhaichte
$160,077–$180,077
Ìre IV
Newark, CA15 Gearr 202421 Ògmh 2024Dearbhaichte

Obraichean eile aig Lucid USA, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).