Dachaigh › Luchd-obrach › M&J Engineering, D.P.C.
M&J Engineering, D.P.C.: Tuarastalan H-1B agus taic bhìosa
Chuir M&J Engineering, D.P.C. 11 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 11. Tuarastal meadhanach a chaidh a thabhann: $104,000.
A bheil M&J Engineering, D.P.C. a’ toirt taic do bhìosaichean H-1B?
Chuir M&J Engineering, D.P.C. 11 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 14 Gibl 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Inspections Engineer | 1 | $93,600 |
| Accounting Associate | 1 | $89,440 |
| Traffic Engineer | 1 | $105,000 |
| Assistant Office Engineer | 1 | $85,696 |
| ITS/Traffic Engineer | 1 | $81,869 |
| Electrical Field Engineer | 1 | $137,000 |
| Environmental Engineer | 1 | $110,240 |
| Office Engineer | 1 | $108,160 |
| Assistant Resident Engineer | 1 | $112,320 |
| Jr. Inspector | 1 | $97,760 |
| Sr. Special Inspector/Field Engineer | 1 | $104,000 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2024 | 1 | $89,440 |
| FY2025 | 5 | $108,160 |
| FY2026 | 5 | $104,000 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Jr. Inspector | $97,760 Ìre I | New Hyde Park, NY | 14 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Sr. Special Inspector/Field Engineer | $104,000 Ìre II | New Hyde Park, NY | 14 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Assistant Resident Engineer | $112,320 Ìre II | New Hyde Park, NY | 26 Sult 2025 | 9 Faoi 2026 | Dearbhaichte |
| Office Engineer | $108,160 Ìre II | New Hyde Park, NY | 15 Lùna 2025 | 16 Sult 2025 | Dearbhaichte |
| Traffic Engineer | $105,000 Ìre II | New Hyde Park, NY | 3 Ògmh 2025 | 16 Ògmh 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| Assistant Office Engineer | $85,696 Ìre I | New Hyde Park, NY | 2 Ògmh 2025 | 1 Dàmh 2025 | Dearbhaichte |
| ITS/Traffic Engineer | $81,869 Ìre I | New Hyde Park, NY | 21 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Electrical Field Engineer | $137,000 Ìre III | New Hyde Park, NY | 15 Gibl 2025 | 2 Sult 2025 | Dearbhaichte |
| Environmental Engineer | $110,240 Ìre II | New Hyde Park, NY | 3 Gibl 2025 | 19 Sult 2025 | Dearbhaichte |
| Accounting Associate | $89,440 E-3 · Ìre I | New Hyde Park, NY | 1 Iuch 2024 | 8 Iuch 2024 | Dearbhaichte |
| Inspections Engineer | $93,600 Ìre II | New Hyde Park, NY | 8 Gibl 2024 | 8 Gibl 2024 | Dearbhaichte, an uair sin air a tharraing air ais |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).