Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Marlabs LLC › Technical Lead

Technical Lead aig Marlabs LLC: Tuarastalan H-1B

7 iarrtasan cumhaichean-obrach airson an dreuchd Technical Lead aig Marlabs LLC. Tuarastal bunasach meadhanach $121,514; leth meadhanach $102,500–$122,650.

Iarrtasan (LCAs)7
Tuarastal meadhanach a chaidh a thabhann$121,514
Leath mheadhanach nan tuarastalan$102,500–$122,650
Ceudail 10mh–90mh$98,080–$124,980

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$123,700
FY20243$103,800
FY20253$121,514

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$126,900
Ìre III
Ridgefield Park, NJ17 Iuch 20254 Sult 2025Dearbhaichte
$121,514–$121,600
Ìre III
Englewood Cliffs, NJ12 Cèit 202530 Sult 2025Dearbhaichte
$101,200
Ìre II
Riviera Beach, FL14 Samh 20246 Gearr 2025Dearbhaichte
$121,600
Ìre III
Ridgefield Park, NJ1 Lùna 202412 Lùna 2024Dearbhaichte
$93,400
Ìre II
Oakwood, GA1 Cèit 202430 Sult 2024Dearbhaichte
$103,800
Ìre III
Englewood Cliffs, NJ19 Gibl 202422 Gibl 2024Dearbhaichte
$123,700
Ìre II
Riverwoods, IL22 Ògmh 20231 Lùna 2023Dearbhaichte

Technical Lead aig gach neach-fastaidh →

Obraichean eile aig Marlabs LLC

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).