Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Marvell Semiconductor, Inc. › Advanced Packaging Staff Engineer

Advanced Packaging Staff Engineer aig Marvell Semiconductor, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Advanced Packaging Staff Engineer aig Marvell Semiconductor, Inc.. Tuarastal bunasach meadhanach $132,704; leth meadhanach $130,000–$136,000.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$132,704
Leath mheadhanach nan tuarastalan$130,000–$136,000
Ceudail 10mh–90mh$121,000–$151,107

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20251$132,704
FY20264$133,000

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$136,000–$161,000
Ìre III
Austin, TX27 Cèit 20261 Dàmh 2026Dearbhaichte
$115,000–$165,000
Ìre II
Westborough, MA19 Màrt 202630 Màrt 2026Dearbhaichte
$130,000–$170,000
Ìre III
Austin, TX16 Màrt 20266 Gibl 2026Dearbhaichte
$161,179–$165,000
Ìre IV
Austin, TX13 Màrt 202630 Màrt 2026Dearbhaichte
$132,704
Ìre III
Westlake Village, CA1 Gibl 20251 Dàmh 2025Dearbhaichte

Obraichean eile aig Marvell Semiconductor, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).